Figure 16.10Example of Primary/Secondary LHOS at Brucejack Mine16.3.4 BACKFILLINGThe primary means of backfilling at the Property will be paste fill, generated fromunclassified mill tailings mixed with adequate cementitious binder, to meet the strengthrequirements of re-exposure. Regular strength paste fill is commonly required wherethere will be re-exposure of vertical stope walls.Pretium Resources Inc. 16-15 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC