13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Figure 16.24Portal Power Schematic16.9.4 COMPRESSED AIRDue to the inefficient nature of mine wide compressed air systems, compressed air willbe supplied by local area compressors. The underground maintenance <strong>and</strong> service bayarea will have a dedicated compressor permanently installed, with air lines from the airreceiver routed to convenient locations in the area.In addition to the permanent compressors, several smaller, portable compressors will beavailable.All mobile drilling equipment, including jumbos, long hole drills, bolters <strong>and</strong> cable bolterswill be equipped with on board compressors. ITH drilling equipment will have portableadjacent compressors to meet their elevated pressure requirements.16.9.5 SERVICE WATER SUPPLYService water supply for drilling <strong>and</strong> dust control will be supplied via a 4 in steel line atthe portal. The line will continue through the main decline ramp to the undergroundworkings. Pressure reducing valves (PRV) will be supplied at the 1,320, 1,220, <strong>and</strong>1,120 levels to reduce the supply pressure below 100 psig.Pretium Resources Inc. 16-60 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!