13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

• Forest Act (BC)• Forest <strong>and</strong> Range Practices Act (BC)• Fisheries Act (BC)• L<strong>and</strong> Act (BC)• Mines Act (BC)• Soil Conservation Act (BC)• Water Act (BC)• Wildlife Act (BC)• Canadian Environmental Protection Act• Canada Transportation• Transportation of Dangerous Goods Act• WHMIS• Safety Act.Lists of the major federal <strong>and</strong> provincial licences, permits, <strong>and</strong> approvals that arerequired to construct, operate, decommission, <strong>and</strong> close the Project are summarized inthe following sections. These lists cannot be considered comprehensive due to thecomplexity of government regulatory processes, which evolve over time, <strong>and</strong> the largenumber of minor permits, licences, approvals, consents, authorizations, <strong>and</strong> potentialamendments that will be required throughout the LOM.BRITISH COLUMBIA AUTHORIZATIONS, LICENCES AND PERMITSProvincial permitting, licensing, <strong>and</strong> approval processes (statutory permit processes) mayproceed concurrently with the BCEAA review or may, at the proponent’s option, follow theEnvironmental Assessment Certificate. No statutory permit approvals may be issuedbefore an Environmental Assessment Certificate is obtained. <strong>Pretivm</strong> will seek to pursueconcurrent permitting for all permits, for which engineering information will be availableat a sufficient level of detail with respect to the concurrent permitting process. Statutorypermit approval processes are normally more specific than the EA level of review, <strong>and</strong> willrequire detailed <strong>and</strong> possibly final engineering design information for certain permits.Table 20.4 presents a list of provincial authorizations, licences, <strong>and</strong> permits required todevelop the Project. The list includes only the major permits <strong>and</strong> is not intended to becomprehensive.Pretium Resources Inc. 20-24 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!