13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Figure 14.1Plan Showing the Distribution of Exploration DrillholesNorthGossan HillShore ZoneWest ZoneVOKBridge ZoneDrilling since the September 2012 Mineral ResourceDrilling included in the September 2012 Mineral Resource14.5 GEOLOGICAL INTERPRETATION AND MODELLING14.5.1 VOKAt VOK, lithological interpretations were used together with a nominal 1 g/t to 3 g/t Aucut-off grade to define high-grade corridors based on analysis of the statistical gradepopulations.High-grade gold mineralization at VOK occurs in a series of west-northwest trending subverticalcorridors of structurally re-oriented vein stockworks <strong>and</strong> subordinate veinbreccias, hosted in a folded sequence of fine grained volcanic siltstone <strong>and</strong> s<strong>and</strong>stone,variably silicified polylithic volcanic conglomerate, fragmental latite volcanic rocks,bounded by relatively massive porphyritic latite flows. Gold mineralization also appearsPretium Resources Inc. 14-3 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!