Figure 21.2 shows the cost distribution in the different areas.Figure 21.2Process Operating Cost DistributionThe estimated labour force cost is $9.71/t milled. A total of 95 personnel are estimatedfor the process operation, including 18 staff for management <strong>and</strong> professional services,38 operators for operating <strong>and</strong> assaying, <strong>and</strong> 39 personnel for maintenance. Theestimate is based on 12 hours per shift, 24 h/d, <strong>and</strong> 365 d/a. The operator rotation isbased on a schedule of two-weeks-in/two-weeks-out. Travel time will occur during theemployee’s time off.The operating cost for the major metal consumables is estimated to be $3.06/t milled.The metal consumables include mill <strong>and</strong> crusher liners, <strong>and</strong> mill grinding media.The estimated reagent cost is $0.94/t milled. Reagent consumptions are estimated fromlaboratory test results <strong>and</strong> comparable operations. The reagent costs are from currentbudget prices received from potential suppliers.The maintenance supply cost is $1.86/t milled while the operating supply cost is $0.66/tmilled.The power cost is estimated at $1.93/t milled. Electricity will be supplied from thetransmission line connected to the mine site. The power cost is based on a unit electricenergy price of $0.050/kWh.21.2.4 BACKFILLING OPERATING COSTSThe estimated operating cost for the backfilling plant is $2.1/t <strong>and</strong> is shown in Table21.8. The estimate includes costs for tailings filtration, paste generation, <strong>and</strong> pastedelivery but excludes the cement cost, which is the major cost for backfilling <strong>and</strong> isincluded in the mining cost estimates.Pretium Resources Inc. 21-15 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!