13.06.2013 Views

ADR --

ADR --

ADR --

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

S •Continuaci6n<br />

- 6.2.23 -<br />

CU<strong>ADR</strong>O 6.2.3<br />

FACTOR CARGOS DE OPERACIONES MANEJOL COM- TOTAL<br />

DE CARGi CAPITAL ADICIONALES BUSTIBLE & COSTO DEL SEC<br />

% POR GJ Y MANTENI - PREPARACION TOR DE DEMA1f<br />

MIENTO POR POR GJ POR GJ<br />

GJ<br />

$$ $ $<br />

B3 25 1.67<br />

Sin secador/<br />

0.34<br />

45<br />

0.63<br />

0.92<br />

2.64<br />

Importado 0.24<br />

65<br />

0.63<br />

0.64<br />

1.79<br />

0.20 0.63 1.47<br />

B4 25 3.38<br />

Con Secador/<br />

0.68<br />

45<br />

0.63<br />

1.87 4.69<br />

Importado<br />

0.49<br />

65<br />

0.63<br />

1.30<br />

2.99<br />

0.41 0.63 2.34<br />

C: 100 bhp<br />

Fabricado<br />

Cl en C.R.<br />

D: 90 bhp<br />

25 1.29<br />

0.25<br />

45<br />

0.67<br />

0.71<br />

2.21<br />

0.17 0.67 1.55<br />

65 0.49 0.14 0.67 1.30<br />

Dl 25 1.06<br />

Gasificador 0.31<br />

sola- 45<br />

0.63<br />

0.59<br />

2.00<br />

mente<br />

0.23<br />

fabricado en<br />

0.63<br />

65 0.41<br />

1.45<br />

0.20<br />

0.63 1.24<br />

Costa Rica<br />

D2 25 1.24<br />

Gasificador+Secadox<br />

0.47<br />

45<br />

0.63<br />

0.69<br />

2.34<br />

Fabricado<br />

0.37<br />

en C.R.<br />

0.63<br />

65 0.48<br />

1.69<br />

0.33 0.63 1.44<br />

D3 25 1.80<br />

Gasificador+Secado 0.47<br />

45<br />

0.63<br />

1.00<br />

2.90<br />

Fabricado 0.37<br />

en C.R. 65<br />

0.63<br />

0.69<br />

2.00<br />

0.33 0.63 1.65<br />

E: 600 bhp<br />

El 25<br />

Importado<br />

2.13 0.38<br />

45<br />

0.58<br />

1.18<br />

3.09<br />

0.27 0.58 2.03<br />

65 0.82 0.22 0.58 1.62<br />

C-6.2.3.1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!