I/ Load factor bused on fuil = total consumption/month.<br />

peak demand/hour x # hours<br />

2/ Load factor bused on time = hours working/month<br />

Notes:<br />

1. They work 12 hr/day and 280 days/year<br />

total hours in month<br />

month<br />

2. They have three peaks during the day, halthours each.<br />

3. Nornkilly two boilers work and to are in stand by.<br />

4. Maximums load factor boil on time of the system is 57%.<br />

5. According to the information would be necessary at least. Wo<br />

gasifiers for boiler No. 2 and boiler No. 3 of 400 Hp and 350 BHP<br />

respectively. Haoever, they switch boilers; in other words the<br />

principal system can be whatever two of four boilers.