2/ Load factor bused on time = hours working/month<br />

Notes:<br />

total hour in a month<br />

1. They use the boilers alternatively during the day the #1 $ am to 6 pm.)<br />

during the nigh 12 (6 pm to 6 am).<br />

2. They don't have peaks in demand, this is constant.<br />

3. Acording to the draw attached, if we turn the boilers would be enough<br />

space for retrofitting.<br />

4. The gasifier capacity may be in the range of 350 BIP to 250 BHP<br />

5. One gasifier would work with both boilers, getting a maximun load<br />

factor of 60%.<br />

6. The fuel substitution/year connccted to boiler # 1-% 163 000 gal/year<br />

connected to boiler #1 and #12 - 270 000gal/year