_/ Load factor bused on Fuel = Total consum pLion/month<br />

peak demand/hour x # hours<br />

2/ Load factor bused on time = hours wori ng/year<br />

Notes:<br />

total hourin a year<br />

months<br />

1. This dairy milk plant is located in San CarJos, Alajuela about 100 )an<br />

away from San Jose, where there is a high concentration of sawrnill<br />

slabs, aproximatly 100 tons/day<br />

2. They use on boiler per week (350 BHP one week and 500 BHP the other)<br />

3. The hot air heater is use to make dust milk, no technical data was<br />

possible to get from this boiler, it is a DenmaMk brand.<br />

4. 20 hours/day and 183 days/year is the working time for the steam<br />

boilers.<br />

5. 20 hours/day and 365 days/year is the working tire for the hot air<br />

boiler.<br />

6. The gasification system may be a 350 BHP capacity, and it should be<br />

matched to 500 BHP boiler as weU.<br />

7. The gasifier system for hot. air boiler should be determined.'