Boilers<br />

COOPEPATIVA MONTECI.LOS (MEAT PACKING PLANT)<br />

Boiler Power Capacity Brand Model Type<br />

BHP ibm/hi<br />

1 500 13 550 York-Shipley SPHC-500-6 Firetubes<br />

2 400 10 792 Cleaver Brooks CB-400 Firetubes<br />

3 200 6 675,4 Ciclo Therm Firetubes<br />

Situration preassure = 7 kg/a 2<br />

All of them use bunker as fuel<br />

Boiler Nominal Actual # hours Load Factor Load Factor<br />

# Consumnp Consump working 1/ 2/'<br />

it/hr lt/hr hr/year<br />

1 525 303,20 2 587,5 17% 29%<br />

2 420 303,20 2 587,5 21% 29%<br />

3 210 161,69 312 3% 3,56