28.12.2012 Views

LCA Food 2012 in Saint Malo, France! - Manifestations et colloques ...

LCA Food 2012 in Saint Malo, France! - Manifestations et colloques ...

LCA Food 2012 in Saint Malo, France! - Manifestations et colloques ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PARALLEL SESSION 5A: FOOD LABELLING 8 th Int. Conference on <strong>LCA</strong> <strong>in</strong> the<br />

Agri-<strong>Food</strong> Sector, 1-4 Oct <strong>2012</strong><br />

2.3. The Product System<br />

The Product System represents the product group model calculation tool. It is developed for each product<br />

group <strong>in</strong> a specific fashion follow<strong>in</strong>g the Product Category Rule (PCR) and is <strong>in</strong>ternally v<strong>et</strong>ted.<br />

Barilla’s EPD Process System <strong>in</strong>cludes Product Systems for pasta, bakery and sauces products. An example<br />

of product system for bakery product is reported <strong>in</strong> Fig. 2.<br />

Figure 2. Example of product system for bakery products<br />

2.4. Verification levels<br />

The reliability of the EPDs is ensured by several verification levels done by Data Assessor, Process Assessor<br />

and Verification Body:<br />

1. Product System and <strong>LCA</strong> Database verification is performed by the Data Assessor;<br />

2. Product specific data, <strong>LCA</strong> data she<strong>et</strong> and EPD Document verification is performed by the Data<br />

Assessor per each EPD realised<br />

3. EPD Process verification by means of:<br />

<strong>in</strong>ternal audit, performed by the Process Assessor<br />

external audit, performed by a Verification Body (accredited body certified for audit of<br />

management systems)<br />

3. Process Operations<br />

Barilla EPD Process System is organised <strong>in</strong> three ma<strong>in</strong> processes, under the control of the management<br />

activities: EPD project, database update and product system update.<br />

The management activities take <strong>in</strong>to consideration all the actions that are necessary for activities coord<strong>in</strong>ation<br />

and organisation, such as EPDs plann<strong>in</strong>g, comp<strong>et</strong>ences evaluations, process assessment plann<strong>in</strong>g, non<br />

conformity management and system documentation updat<strong>in</strong>g. An overview of the processes is given <strong>in</strong> Fig.<br />

3.<br />

The first activity of the system is the EPD plann<strong>in</strong>g, it is performed each year to organize all the works related<br />

to the EPD Process System. To reliably plan the EPD projects, the collection of all the product recipe is<br />

necessary to identify raw material still not covered by an update data module.<br />

433

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!