28.12.2012 Views

LCA Food 2012 in Saint Malo, France! - Manifestations et colloques ...

LCA Food 2012 in Saint Malo, France! - Manifestations et colloques ...

LCA Food 2012 in Saint Malo, France! - Manifestations et colloques ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PARALLEL SESSION 5A: FOOD LABELLING 8 th Int. Conference on <strong>LCA</strong> <strong>in</strong> the<br />

Agri-<strong>Food</strong> Sector, 1-4 Oct <strong>2012</strong><br />

<strong>LCA</strong> developer: is supported by an <strong>LCA</strong> team, that manages all the activities necessary for the<br />

EPD document preparation, data modules and product system development and update;<br />

Data owners are <strong>in</strong> charge of provid<strong>in</strong>g data and <strong>in</strong>formation needed for <strong>LCA</strong> calculations. They<br />

usually have precise functions and are responsible for specific areas (e.g. packag<strong>in</strong>g production,<br />

production process, product transport, <strong>et</strong>c). They are identified and <strong>in</strong>volved <strong>in</strong> data collection accord<strong>in</strong>g<br />

to the annual EPD work plan and they have to know the procedure for the data collection;<br />

Data expert represents personnel that could assist both specific data verification (peer review)<br />

dur<strong>in</strong>g <strong>LCA</strong> calculation and EPD preparation. A data expert may be identified dur<strong>in</strong>g the management<br />

review to support data collection and verification dur<strong>in</strong>g <strong>LCA</strong> calculation. A data expert<br />

may be sought for strategic and relevant <strong>in</strong>formation such as wheat cultivation, palm oil production,<br />

<strong>et</strong>c. This figure can either be an <strong>in</strong>ternal or external resource;<br />

System reliability is guaranteed by several verifiers (data assessor, process assessor and verification<br />

body), their roles are described below:<br />

Data assessor: is personnel responsible for the verification of the <strong>LCA</strong> calculation and of the EPD<br />

document. The data assessor conducts <strong>in</strong>ternal assessments at planned <strong>in</strong>tervals to d<strong>et</strong>erm<strong>in</strong>e the<br />

reliability, relevance and <strong>in</strong>dependence of the EPD;<br />

Process assessor: is an <strong>in</strong>ternal verifier that regularly assesses the conformity of the EPD process.<br />

The process assessor is the <strong>in</strong>ternal verifier that has the responsibility to perform periodic audits<br />

on system application;<br />

Verification Body: represents an accredited body certified for audit of management systems that<br />

verifies the entire EPD process system.<br />

Each actor <strong>in</strong> the process has qualified and formalised comp<strong>et</strong>ences.<br />

6. Results and Conclusion<br />

Barilla is the first private company that has developed an EPD Process System.<br />

About the 46% of the products put on the mark<strong>et</strong> by Barilla dur<strong>in</strong>g year 2011 are covered by an Environmental<br />

Product Declaration (EPD). At 30 th April <strong>2012</strong>, fifteen EPDs were published on the website<br />

(http://www.environdec.com/en/EPD-Search/?query=barilla) and about six hundreds data modules were<br />

realised; the available data modules are over the 90% and validated data modules among the available ones<br />

are over the 75%. The use of the Barilla EPD Process System has shortened EPD publication tim<strong>in</strong>g, that<br />

now lasts about 6-10 weeks.<br />

Table 2. Performance of the EPD Process System<br />

Indicators Unit Data<br />

Product volume covered by EPDs (year 2011) % 46%<br />

Planned projects (year <strong>2012</strong>) n° 39<br />

Open Projects (po<strong>in</strong>t at 30/04/<strong>2012</strong>) n° 13<br />

Frozen Projects (po<strong>in</strong>t at 30/04/<strong>2012</strong>) n° 0<br />

Validated EPD (po<strong>in</strong>t at 30/04/<strong>2012</strong>) n° 18<br />

Published EPD (po<strong>in</strong>t at 30/04/<strong>2012</strong>) n° 15<br />

Product System (po<strong>in</strong>t at 30/04/<strong>2012</strong>) n° 6<br />

Product System validated (po<strong>in</strong>t at 30/04/<strong>2012</strong>) % 67%<br />

Product Volume covered by Product System (year 2011) % 99,7%<br />

Total module (po<strong>in</strong>t at 30/04/<strong>2012</strong>) n° 610<br />

Available data module (po<strong>in</strong>t at 30/04/<strong>2012</strong>) % 97<br />

Validated data module (po<strong>in</strong>t at 30/04/<strong>2012</strong>) % 79<br />

Table 2 shows the Barilla EPD Process System performances through the system <strong>in</strong>dicators, from 2010 to<br />

April <strong>2012</strong>. Look<strong>in</strong>g at the table, it is important to po<strong>in</strong>t out that:<br />

There are 39 EPD projects planned for <strong>2012</strong>; 13 of these conta<strong>in</strong> more than one product to be<br />

analysed because there are several recipe variants for some products;<br />

There are no frozen projects because there were no problems with data availability;<br />

There is a higher number of validated EPDs respect to published EPD because it was decided to<br />

not publish three of the validated EPDs;<br />

From 2010 to April <strong>2012</strong> forty verifications were performed: four external verifications made by Bureau<br />

Veritas, and the others made by data and process assessors for <strong>in</strong>ternal verifications.<br />

435

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!