04.03.2013 Views

Manual

Manual

Manual

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Manual</strong> – TopCon TC.GSS<br />

Installation and commissioning<br />

Installation<br />

6. Installation and commissioning<br />

6.1. Installation<br />

6.1.1. Transport<br />

TopCon power supplies are always supplied with 2 strong carrying handles<br />

(steel sheet). These handles are inserted in the slots in the side of<br />

case and make it possible to transport the device easily.<br />

Fig. 57 Attaching the carrying handles to transport a<br />

TopCon power supply.<br />

Due the high weight it is advisable to carry the device between 3-4<br />

people and whenever possible to use a trolley or crane.<br />

Remove the carrying handles after transporting the TopCon power<br />

supply and store them in a safe place.<br />

6.1.2. Building in the device<br />

These installation instructions apply to standard TopCon TC.GSS power<br />

supplies with a complete case and internal liquid cooling with 3 fans<br />

on the rear of the device.<br />

2011-10-18 105 / 298 V00.05b<br />

6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!