04.03.2013 Views

Manual

Manual

Manual

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Manual</strong> – TopCon TC.GSS<br />

Control group<br />

TopControl application<br />

Tab – <br />

1<br />

3<br />

Fig. 121 “Control” group on the tab and its submenus.<br />

“Control” group – parameters<br />

1<br />

2<br />

3<br />

4<br />

, button<br />

Starts the recording process<br />

Button changes to <br />

TopControl waits for a trigger event,<br />

see “Trigger” group Table 110, Seite 216.<br />

Stops the recording process<br />

Button changes to <br />

, button<br />

Starts the transfer and indication of the data recorded from the TC.GSS power<br />

supply to the TopControl application.<br />

, button<br />

Opens the “SCOPE option” window with automation options.<br />

Meaning of the check boxes if they are selected:<br />

“Auto upload...” Transfer the data immediately from the TC.GSS power supply<br />

to the TopControl application. (Recommended)<br />

“Auto restart...” Recording is repeated immediately.<br />

Optional restriction: only with trigger set<br />

“Hide reference channels...”<br />

The related reference signal for deactivated signal channel<br />

is hidden. (Recommended)<br />

“Reset zoom after uploading data...”<br />

Indication is reset when new data are uploaded.<br />

, button<br />

Opens the submenu for editing -5-, -6-, -7-, -8-, -9-.<br />

1 Scope file is included in the list box. See Fig. 115, Seite 201.<br />

The table is continued on the next page.<br />

2011-10-18 213 / 298 V00.05b<br />

2<br />

4<br />

7<br />

5<br />

6<br />

7<br />

8<br />

9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!