<strong>Manual</strong> – TopCon TC.GSS<br />

Installation and commissioning<br />

Installation<br />

Air supply -1-: The cooling air is drawn in at the front. The air must be<br />

supplied unhindered, any air filters necessary are to be installed in the<br />

cabinet door or directly on the front of the power supplies. For an adequate<br />

supply of air, an inlet opening of at least 300 mm x 300 mm is to<br />

be provided per power supply and, if necessary, covered with a correspondingly<br />

large air filter.<br />

Air removal -2-: The cooling air discharged from the power supplies at the<br />

rear. It is imperative there is adequate clearance for the passage of the air:<br />

at least 150 mm deep -3- over the full width of the power supply.<br />

The cooling air can be discharged via the roof and/or rear wall. During this<br />

process an “air short-circuit” -4- must be avoided.<br />

(Directly drawing back in discharged cooling air)<br />

Liquid cooling<br />

In the case of TopCon TC.GSS power supplies with water-water heat exchangers<br />

that you always provide enough space for the connections for your<br />

cooling system within a switch cabinet.<br />

Further information in chapter 5.2.1, Seite 71.<br />