04.03.2013 Views

Manual

Manual

Manual

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Manual</strong> – TopCon TC.GSS<br />

Installation and commissioning<br />

Switching on and off a TopCon power supply<br />

6.3.2. Switching on and off a TopCon power supply<br />

6.3.2.1. Switching on the device<br />

Switch on main switch.<br />

On the front of the TopCon TC.GSS power supply in the form of<br />

a triple switch.<br />

The TopCon power supply is booted.<br />

The signal processor is initialised and a device self-test<br />

performed.<br />

Can be seen on the HMI/RCU during the login process:<br />

Login: HMI login on the system<br />

System information screen:<br />

The system information screen appears for approx. 5 s and<br />

changes to the main screen.<br />

At the end of the successful start process, the green “Power”<br />

LED on the front of the device illuminates.<br />

6.3.2.2. Switching off the device<br />

Switch off the device via the main switch.<br />

The shutdown process is indicated on the front of the TopCon<br />

power supply as a running light on the STATUS LED.<br />

The running light continues until the internal energy stores are<br />

discharged.<br />

2011-10-18 115 / 298 V00.05b<br />

6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!