03.01.2013 Views

the shape of things to come

the shape of things to come

the shape of things to come

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Simon’s Simca ambulance carries 4 items<br />

<strong>of</strong> paramedic equipment worth 7,500 C-bills<br />

each, plus four extra seats used <strong>to</strong> represent<br />

stretcher and passenger space (each worth<br />

100 C-bills), a 136-kilogram basic cargo<br />

space (free), and a rear bay door worth<br />

1,000 C-bills. Toge<strong>the</strong>r, <strong>the</strong>se items add 31,400 C-bills <strong>to</strong> <strong>the</strong><br />

Simca’s costs ([4 x 7,500] + [4 x 100] + 0 + 1,000 = 31,400). In<br />

addition, <strong>the</strong> Simca’s three crew seats add 300 C-bills more<br />

<strong>to</strong> <strong>the</strong> equipment costs for 31,700 C-bills in <strong>to</strong>tal equipment<br />

(31,400 + [3 x 100] = 31,700).<br />

Toge<strong>the</strong>r with its 4,043.75-C-bill structure costs, <strong>the</strong><br />

Simca is currently worth 35,743.75 C-bills (4,043.75 +<br />

31,700 = 35,743.75).<br />

Christine’s Dixon carries 4 machine<br />

guns (5,000 C-bills each) and 2 medium<br />

lasers (40,000 C-bills each) for a <strong>to</strong>tal <strong>of</strong><br />

100,000 C-bills in weapons ([4 x 5,000] +<br />

[2 x 40,000] = 100,000), for which she has also installed<br />

basic fi re control worth 5,000 C-bills (5 percent <strong>of</strong> 100,000<br />

C-bills = 5,000), giving a weapons and fi re control weight<br />

<strong>of</strong> 105,000 C-bills.<br />

The Airship also carries 4 sprayers (1,000 C-bills each),<br />

which require 10 <strong>to</strong>ns <strong>of</strong> liquid s<strong>to</strong>rage and pumps (1,000<br />

C-bills; 100 C-bills x 10 C-bills per <strong>to</strong>n = 1,000 C-bills), 3 light<br />

vehicle bays (10,000 C-bills each), 3 bay doors (1,000 C-bills<br />

each) and an arresting lift hoist (50,000 C-bills). In addition,<br />

<strong>the</strong> Dixon boasts 6 <strong>to</strong>ns <strong>of</strong> communications equipment (at<br />

10,000 C-bills per <strong>to</strong>n), 2 mounted searchlights (2,000 each)<br />

and 6 <strong>to</strong>ns <strong>of</strong> infantry compartments worth 0 C-bills per<br />

<strong>to</strong>n (as <strong>the</strong>y were added over and above <strong>the</strong> weight-free<br />

crew and passenger facilities, <strong>the</strong> Dixon would invest in<br />

<strong>the</strong>se added facilities; but as because Christine chose <strong>the</strong><br />

minimalist compartments over dedicated infantry bays,<br />

<strong>the</strong>se compartments have a base cost <strong>of</strong> 0 C-bills per <strong>to</strong>n).<br />

The remaining standard cargo space is free, so <strong>the</strong> various<br />

added equipment <strong>come</strong>s <strong>to</strong> a <strong>to</strong>tal <strong>of</strong> 151,100 C-bills ([4 x<br />

1,000] + 1,000 + [3 x 10,000] + [3 x 1,000] + 50,000 + [6 x<br />

10,000] + [2 x 2,000] + [6 x 0] = 152,000). Combined with<br />

<strong>the</strong> 105,000 C-bills for weapons and fi re control, <strong>the</strong> Dixon’s<br />

<strong>to</strong>tal investment in weapons and equipment <strong>come</strong>s<br />

<strong>to</strong> 257,000 C-bills.<br />

With a structural cost <strong>of</strong> 529,125, <strong>the</strong> current <strong>to</strong>tal cost<br />

for <strong>the</strong> Dixon <strong>come</strong>s <strong>to</strong> 786,125 C-bills (529,125 + 257,000 =<br />

786,125).<br />

Max’s Purifi er battle armor incorporates<br />

a single modular weapon mount ra<strong>the</strong>r than<br />

a dedicated weapon. This mount costs 1,000<br />

C-bills, which combines with <strong>the</strong> battlesuit’s<br />

425,000 C-bill structure cost for a running <strong>to</strong>tal<br />

<strong>of</strong> 426,000 C-bills in its base confi guration.<br />

Based on this price, Max also computes<br />

that <strong>the</strong> Primary (ER small laser) confi guration <strong>of</strong> his suit<br />

will add 11,250 C-bills <strong>to</strong> this cost, for a current Primary<br />

Purifi er cost <strong>of</strong> 437,250 C-bills (426,000 + 11,250 = 437,250).<br />

Robert’s ’Mechbuster (laser variant)<br />

carries 3 medium lasers for armaments at<br />

a cost <strong>of</strong> 40,000 per weapon. With no o<strong>the</strong>r<br />

weapons components installed, <strong>the</strong> fi ghter’s<br />

weapons add <strong>to</strong> its 337,633.333 C-bill<br />

structure costs <strong>to</strong> produce a current <strong>to</strong>tal <strong>of</strong><br />

457,633.333 C-bills (337,633.333 + [3 x<br />

40,000] = 457,633.333).<br />

For weapons alone, Chris’ Nekohono’oclass<br />

DropShip carries 3 Kraken-T capital<br />

missile launchers (500,000 C-bills each),<br />

2 screen launchers (250,000 each), 2<br />

MRM 40s (350,000 each), 5 Streak SRM-<br />

6s (120,000 each), 6 MRM-30s (225,000<br />

each), 4 gauss rifles (300,000 each), 4 LRM-20s with<br />

Artemis (350,000 each), 10 ER PPCs (300,000 each), 10 LB<br />

10-X ACs (400,000 each), 6 Streak SRM-4s (90,000 each), 6<br />

ER medium lasers (80,000 each) and 7 large pulse lasers<br />

(at 175,000 each). The <strong>to</strong>tal for <strong>the</strong>se weapons <strong>come</strong>s<br />

<strong>to</strong> 16,495,000 C-bills ([3 x 500,000] + [2 x 250,000] + [2 x<br />

350,000] + [5 x 120,000] + [6 x 225,000] + [4 x 300,000] + [4<br />

x 350,000] + [10 x 300,000] + [10 + 400,000] + [6 x 90,000]<br />

+ [6 x 80,000] + [7 x 175,000] = 16,495,000).<br />

In addition, <strong>the</strong> DropShip has 6 fi ghter and 9 Small Craft<br />

cubicles (all at 20,000 C-bills each), 27 battle armor squad<br />

cubicles (considered free; counted <strong>to</strong>ward quarters/life<br />

support costs), 8 bay doors (at 1,000 C-bills each) and 6<br />

escape pods (5,000 each). Quarters for <strong>the</strong> crew and passengers,<br />

again, are not counted <strong>to</strong>ward pricing, as <strong>the</strong>y<br />

are considered part <strong>of</strong> <strong>the</strong> life support costs and vessel<br />

structure. Nei<strong>the</strong>r is <strong>the</strong> 1,548.5-<strong>to</strong>n capacity standard<br />

cargo bay. This means that <strong>the</strong> various non-weapon items<br />

add ano<strong>the</strong>r 338,000 C-bills <strong>to</strong> <strong>the</strong> Nekohono’o’s cost ([6 x<br />

20,000] + [9 x 20,000] + [27 x 0] + [8 x 1,000] + [6 x 5,000]<br />

= 338,000).<br />

Combined, <strong>the</strong> 12,491,600 C-bills <strong>of</strong> structural costs,<br />

plus <strong>the</strong> 16,495,000 C-bills <strong>of</strong> weapons and <strong>the</strong> 338,000<br />

<strong>of</strong> non-weapon items, bring <strong>the</strong> Nekohono’o <strong>to</strong> a current<br />

(unloaded) price <strong>of</strong> 29,324,600 C-bills.<br />

FINAL UNIT COSTS<br />

Once a unit’s structural costs have been added <strong>to</strong> its weapons<br />

and equipment costs, <strong>the</strong> unit’s fi nal <strong>to</strong>tal cost may be computed<br />

by fac<strong>to</strong>ring in any Omni Conversion costs, unit cost multipliers<br />

and such. These fi nal costs account for extra features that aff ect<br />

<strong>the</strong> design overall, as well as <strong>the</strong> labor, support, resource processing<br />

and o<strong>the</strong>r abstract minutiae that can go in<strong>to</strong> unit design.<br />

The Final Unit Cost Formulas Table (see p. 285) shows how each<br />

unit sums up its appropriate structural and weapons costs, and<br />

applies any Omni Conversion costs, as well as giving fi nal unit<br />

computation values. Once applied, <strong>the</strong> unit’s fi nal cost may be<br />

rounded as indicated under Basic Cost Calculations (see p. 284).

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!