SECTION 014500 - QUALITY CONTROL: continued<br />

specified in the IAQ Management Plan. Coordinate prefunctional tests and startup<br />

testing with Cx.<br />

3. Attendees:<br />

a. As a minimum, the Contractor's personnel required to attend include an <strong>of</strong>ficer <strong>of</strong><br />

the firm, the Project Manager, Project Superintendent, QC Manager, Alternate<br />

QC Manager, QC Specialists, CA, Environmental Manager, and subcontractor<br />

representatives. Each subcontractor who will be assigned QC responsibilities shall<br />

have a principal <strong>of</strong> the firm at the meeting. Minutes <strong>of</strong> the meeting will be prepared<br />

by the QC Manager and signed by the Contractor and the Owner's Representative.<br />

Provide a copy <strong>of</strong> the signed minutes to all attendees and shall be included in the<br />

QC Plan.<br />

1.09 QC MEETINGS:<br />

A. After the start <strong>of</strong> construction, conduct QC meetings once every two weeks by the QC<br />

Manager at the work site with the Project Superintendent, QC Specialists, the CA, and the<br />

foremen who are performing the work <strong>of</strong> the DFOWs. The QC Manager is to prepare the<br />

minutes <strong>of</strong> the meeting and provide a copy to the Contracting Officer within two working days<br />

after the meeting. The Contracting Officer may attend these meetings. As a minimum,<br />

accomplish the following at each meeting:<br />

1. Review the minutes <strong>of</strong> the previous meeting.<br />

2. Review the schedule and the status <strong>of</strong> work and rework.<br />

3. Review the status <strong>of</strong> submittals.<br />

4. Review the work to be accomplished in the next two weeks and documentation required.<br />

5. Resolve QC and production problems (RFI, etc.).<br />

6. Address items that may require revising the QC Plan.<br />

7. Review Accident Prevention Plan (APP).<br />

8. Review environmental requirements and procedures.<br />

9. Review Waste Management Plan.<br />

10. Review IAQ Management Plan.<br />

11. Review Environmental Management Plan.<br />

12. Review the status <strong>of</strong> training completion.<br />

13. Review Cx Plan and progress.<br />

1.10 DESIGN REVIEW AND DOCUMENTATION:<br />

A. Basis <strong>of</strong> Design and Design Intent:<br />

1. Review the basis <strong>of</strong> design received from the Contracting Officer and the design intent.<br />

2. Design Review:<br />

a. Review design documents to verify that each commissioned system meets the<br />

design intent relative to functionality, energy performance, water performance,<br />

maintainability, sustainability, system cost, indoor environmental quality, and local<br />

environmental impacts. Fully document review in written report.<br />

3. Contract Document Review:<br />

a. Review the Contract documents to verify that Cx is adequately specified, and that<br />

each commissioned system is likely to meet the design intent relative to<br />

functionality, energy performance, water performance, maintainability,<br />

sustainability, system cost, indoor environmental quality, and local environmental<br />

impacts.<br />

014500-8 DEAN014500.DOC