SECTION 019113 GENERAL COMMISSIONING REQUIREMENTS: continued<br />

2. Assist in equipment testing per agreements with Subcontractors.<br />

3. Include all special tools and instruments (only available from vendor, specific to a piece<br />

<strong>of</strong> equipment) required for testing equipment according to these Contract Documents in<br />

the base bid price to the Contractor. Through the contractors they supply products to,<br />

analyze specified products and verify that the architect has specified the newest most<br />

updated equipment reasonable for this project’s scope.<br />

4. Provide information requested by CA regarding equipment sequence <strong>of</strong> operation and<br />

testing procedures.<br />

5. Review test procedures for equipment installed by authorized factory representatives.<br />

G. Controls & TAB Contractors<br />

1. Controls & TAB Contractors will be responsible to carry out the commissioning<br />

requirements specified in Section 230910.<br />

1.7 SYSTEMS TO BE COMMISSIONED<br />

A. This project will require integrated total building commissioning to include all <strong>of</strong> the following<br />

systems:<br />

Building Envelope<br />

Central Building Automation Systems<br />

Geothermal Wells and Associated Pumps, Piping and Accessories<br />

Water Source Heat Pumps<br />

Dedicated Outdoor Air System<br />

Air Distribution System<br />

Ductless Air Conditioning Units<br />

Unit Heaters<br />

Exhaust Fans<br />

Domestic Hot Water System<br />

Lighting Controls Systems<br />

Fire Protection Systems<br />

PART 2 - PRODUCTS – (NOT APPLICABLE)<br />

PART 3 - EXECUTION<br />

3.1 REPORTING<br />

A. The CA will provide regular field reports to the Owner as construction and commissioning<br />

progresses.<br />

DEAN019113.DOCX 019113-5