SECTION 262213 - TRANSFORMERS: continued<br />

C. Provide bracing and supports to resist the forces <strong>of</strong> a Seismic Zone 2A event without collapse<br />

or over-turning <strong>of</strong> the transformer.<br />

D. Do not mount transformer within 40 inches <strong>of</strong> cable tray.<br />

E. Provide concrete raised housekeeping pads for floor-mounted transformer.<br />

3.03 GROUNDING:<br />

A. Provide equipment grounding connections for transformers as specified, indicated, and as<br />

required. Tighten connections to comply with tightening torques specified in UL 486A to<br />

assure permanent and effective grounding. Provide grounding in accordance with<br />

SECTION 260526.<br />

3.04 IDENTIFICATION:<br />

A. Provide identification <strong>of</strong> transformers as specified in SECTION 260553 - ELECTRICAL<br />

IDENTIFICATION.<br />

3.05 TESTING:<br />

A. Prior to energization <strong>of</strong> transformers, check all accessible connections for compliance with<br />

manufacturer's torque tightening specifications. Clean out any dust and dirt.<br />

B. Prior to energization, check circuitry for electrical continuity and for short circuits.<br />

C. Perform insulation resistance test: High-voltage winding to low-voltage winding, low-voltage<br />

winding to ground, and high-voltage winding to ground. Record and submit test results.<br />

D. Perform transformer turns ratio test (TTR) on the full winding and all taps. Record and submit<br />

test results.<br />

E. Upon completion <strong>of</strong> installation <strong>of</strong> transformers and testing, energize primary circuitry at rated<br />

voltage and frequency from normal power source, and test transformers, including, but not<br />

limited to, audible sound levels, to demonstrate capability and compliance with requirements.<br />

Where possible, correct malfunctioning units at the site then retest to demonstrate compliance;<br />

otherwise, remove and replace with new units or components and proceed with retesting.<br />

F. Adjust transformer primary taps for nominal system voltage at initial installation and again<br />

when the transformer reaches its designed "full" load condition after occupancy by the<br />

Contracting Officer. Schedule all required electrical outages with the Contracting Officer.<br />

END OF SECTION 262213<br />

262213-4 DEAN262213.DOC