14.07.2014 Views

Specifications - State of Delaware

Specifications - State of Delaware

Specifications - State of Delaware

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SECTION 283100 - FIRE ALARM SYSTEMS/ MASS NOTIFICATION SYSTEM: continued<br />

1.04 SUBMITTALS:<br />

A. Refer to DIVISION 01 and SECTION 260000 - BASIC ELECTRICAL REQUIREMENTS,<br />

for administrative and procedural requirements for submittals.<br />

B. All submittals shall also be sent to the local Fire Marshall or "authority having jurisdiction" for<br />

approval. Each submittal shall be a complete submittal including shop drawings, annotated<br />

data sheets and calculating partial submittals will not be accepted.<br />

C. Includes, but not limited to, the following:<br />

1. Product Data: Submit manufacturer's technical product data, including specifications and<br />

installation instructions, for each type <strong>of</strong> fire alarm system component. Submit device<br />

power requirements: maximum voltage, nominal voltage, minimum voltage, amperes<br />

and watts for each device requiring power. Submit battery calculations. Submit battery<br />

charger calculations. Include standard or typical riser and wiring diagrams, and operation<br />

and maintenance instructions for inclusion in maintenance manuals.<br />

2. The use <strong>of</strong> SFPE Handbook or NFPA 72 Handbook to confirm acoustical requirements<br />

where a sounder/speaker is outside its listed spacing shall be acceptable.<br />

3. Shop Drawings: Provide shop drawings showing equipment/device locations, conduit<br />

sizes, logic diagrams, and point-to-point field wiring diagrams <strong>of</strong> entire fire alarm<br />

system. Include wiring and riser diagrams. Licensed fire protection engineer shall seal<br />

and sign the fire alarm shop drawings.<br />

4. Operation and Maintenance Manual: Submit maintenance data and parts lists for each<br />

type <strong>of</strong> fire alarm equipment installed, including furnished specialties and accessories.<br />

Include product data and shop drawings in accordance with requirements <strong>of</strong><br />

DIVISION 01. Submit when construction is 75% complete. Three copies <strong>of</strong> final<br />

manuals are required. Manuals will be required to include but not limited to:<br />

a. Full instructions on servicing and maintenance requirements.<br />

b. Operating instructions including start up, emergency shut down and start up,<br />

seasonal servicing and start up, etc.<br />

c. Contracting Officer's manuals for each item <strong>of</strong> equipment.<br />

d. All equipment wiring diagrams.<br />

e. All piping and wiring systems diagrams and operational diagrams.<br />

f. Full parts lists and exploded schematic diagrams.<br />

g. Full warranty information.<br />

h. All available manufacturer installation and O&M manuals.<br />

i. Full names, address, phone numbers, suppliers, service companies, contact numbers<br />

and other points <strong>of</strong> contact/information relative to this job.<br />

5. Certification <strong>of</strong> proper system operation, including all existing and new devices.<br />

6. The contractor shall submit all field test data per NFPA 72, including "NFPA 72<br />

Inspectors and Testing Forms." These reports shall be submitted a minimum <strong>of</strong> 30 days<br />

prior to scheduling <strong>of</strong> Final ANG acceptance Inspections/Testing and Commissioning.<br />

These documents shall be provided as a submittal for review and approval prior to<br />

scheduling acceptance inspection and testing. Final inspection will be scheduled upon<br />

approval <strong>of</strong> the submission documents.<br />

7. Commissioning checklists.<br />

8. Posted operation instructions shall be framed under glass and shall include floor plans<br />

showing all fire alarm device locations, fire alarm wiring diagrams, and fire alarm<br />

schematic diagrams. Posted instructions shall be pr<strong>of</strong>essionally prepared graphics,<br />

printed on full size sheets and shall be in color.<br />

9. As Built drawings.<br />

283100-2 DEAN283100.DOC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!