LEED 2009 for New Construction and Major Renovations<br />

<strong>Delaware</strong> ARNG Regional Training Institute 8/28/2012<br />

BID FINAL SUBMITTAL<br />

SPECIFICATION SECTION 018113.13 -- EXHIBIT 1<br />

2 Credit 3 Enhanced Commissioning<br />

DE ARNG has contracted with CxA for Cx and ECx services.<br />

2 Credit 4 Enhanced Refrigerant Management<br />

Achievable based on all R410A refrigerant use.<br />

3 Credit 5<br />

2 Credit 6<br />

Measurement and Verification<br />

Green Power<br />

BMCD recommends M&V plan after one year <strong>of</strong> stable building operation to set<br />

building baseline for ongoing performance. DE ARNG Energy Manager will develop<br />

M&V Plan and implement.<br />

7 0 7 RP Materials and Resources<br />

Y ? N Notes:<br />

Y Prereq 1 Storage and Collection <strong>of</strong> Recyclables<br />

Required--must accommodate occupant recycling in FFE. Government will need to<br />

include recycle bins for the breakroom and training rooms into the FFE.<br />

3 Credit 1.1 Building Reuse—Maintain Existing Walls, Floors, and Ro<strong>of</strong><br />

n/a<br />

Reuse 55%<br />

Reuse 75%<br />

Reuse 95%<br />

1 Credit 1.2 Building Reuse—Maintain 50% <strong>of</strong> Interior Non-Structural n/a<br />

2 X Credit 2 Construction Waste Management<br />

1 50% Recycled or Salvaged<br />

Requiring 75% waste diversion by Contractor in specifications. Existing building<br />

1 75% Recycled or Salvaged<br />

demolition diversion can contribute heavily.<br />

2 Credit 3 Materials Reuse<br />

Reuse 5%<br />

Reuse 10%<br />

Challenging to meet 5% threshold<br />

2 Credit 4 Recycled Content<br />

2 Credit 5<br />

1 10% <strong>of</strong> Content<br />

1 20% <strong>of</strong> Content<br />

Regional Materials<br />

1 10% <strong>of</strong> Materials<br />

Should be possible with procurement planning. Required <strong>of</strong> contractor in<br />

1 20% <strong>of</strong> Materials<br />

specifications.<br />

1 Credit 6 Rapidly Renewable Materials Challenging to meet 2.5% threshold<br />

50% wood products must be FSC-certified (minimal wood). Required <strong>of</strong><br />

Certified Wood<br />

contractor in specifications.<br />

1 Credit 7<br />

Should be possible with procurement planning. Required <strong>of</strong> contractor in<br />

specifications.<br />

11 1 3 RP<br />

Indoor Environmental Quality<br />

Y ? N Notes:<br />

Y Prereq 1 Minimum Indoor Air Quality Performance<br />

Required--design will comply<br />

Y Prereq 2 Environmental Tobacco Smoke (ETS) Control<br />

Required--must show exterior smoking area with signage and non-smoking policy.<br />

Guard sent the no-smoking policy.<br />

1 Credit 1 Outdoor Air Delivery Monitoring<br />

Design includes CO2 monitors in high density spaces; airflow monitors on AHUs<br />

1 Credit 2 Increased Ventilation<br />

Not achievable<br />

1 Credit 3.1 Construction IAQ Management Plan—During Construction<br />

Required <strong>of</strong> contractor in specifications.<br />

1 Credit 3.2 Construction IAQ Management Plan—Before Occupancy<br />

Required <strong>of</strong> contractor in specifications.<br />

1 Credit 4.1 Low-Emitting Materials—Adhesives and Sealants<br />

Required <strong>of</strong> contractor in specifications.<br />

1 Credit 4.2 Low-Emitting Materials—Paints and Coatings<br />

Required <strong>of</strong> contractor in specifications.<br />

1 Credit 4.3 Low-Emitting Materials—Flooring Systems<br />

Required <strong>of</strong> contractor in specifications.<br />

1 Credit 4.4 Low-Emitting Materials—Composite Wood/Agrifiber<br />

Required <strong>of</strong> contractor in specifications.<br />

1 Credit 5 Indoor Chemical and Pollutant Source Control<br />

Plans show 10' entryway system at main entries (not all); MERV 13 filters; isolated<br />

janitor closets. Requires MERV 13 filters by contractor pre-occupancy.<br />

Must have task lighting in all workstations--need Gov't assist to document this credit,<br />

1 Credit 6.1 Controllability <strong>of</strong> Systems—Lighting<br />

which can be easily achieved.<br />

1 Credit 6.2 Controllability <strong>of</strong> Systems—Thermal Comfort<br />

Not achievable<br />

1 Credit 7.1 Thermal Comfort—Design<br />

Design will comply and has a DDC BMS<br />

1 Credit 7.2 Thermal Comfort—Verification<br />

Survey occupants on thermal comfort and implement corrections. The Guard will<br />

implement the survey from BMCD's sample survey.<br />

Required daylight levels in all <strong>of</strong>fice areas, training rooms, classrooms, conference<br />

1 Credit 8.1 Daylight and Views—Daylight<br />

rooms--need to calculate for compliance.<br />

1 Credit 8.2 Daylight and Views—Views<br />

To meet requirement, training rooms need views.<br />

LEED 2009 for New Construction and Major Renovations Project Checklist 2 <strong>of</strong> 3