SECTION 018113.13 - SUSTAINABLE DESIGN REQUIREMENTS - LEED ® FOR NEW<br />

CONSTRUCTION AND MAJOR RENOVATIONS: continued<br />

1.04 ADMINISTRATIVE REQUIREMENTS:<br />

A. Respond to questions and requests from Architect and the USGBC/GBCI regarding LEED<br />

credits that are the responsibility <strong>of</strong> the Contractor, that depend on product selection or product<br />

qualities, or that depend on Contractor's procedures until the USGBC has made its<br />

determination on the project's LEED certification application. Document responses as<br />

informational submittals.<br />

B. Contractor shall be responsible to complete the Construction Submittal LEED Credit Forms<br />

and upload supporting documentation to LEED On-line at the completion <strong>of</strong> the project. When<br />

all Construction Phase documentation is uploaded and complete, the Contractor is responsible<br />

to pay the LEED Construction Submittal Review fee to the Green Building Certification<br />

Institute (GBCI) through LEED On-line and submit the project for the Preliminary<br />

Construction Submittal Review. Within 15 business days <strong>of</strong> receipt <strong>of</strong> the Preliminary<br />

Construction Submittal Review Comments from the GBCI review team, the Contractor shall<br />

respond to any questions or requests for clarifications to Construction Credits and submit for<br />

the Final Construction Submittal Review. Should any construction credits require a Credit<br />

Appeal, the Contractor shall be responsible to pay the Appeal fee to GBCI for the Appeal<br />

Review process.<br />

C. As clarification, the A/E is responsible to complete the Design Phase LEED Credit Forms and<br />

upload supporting documentation to LEED Online, pay the review fee to GBCI for the<br />

Preliminary Design Submittal Review, respond to review comments from the GBCI Review<br />

Team for the Final Design Submittal Review and pay any fees for Design phase credit appeal<br />

reviews to GBCI.<br />

D. Contractor shall be responsible to purchase the project's LEED Certification Plaques upon<br />

GBCI final LEED certification award on behalf <strong>of</strong> the project and to mount the plaque in a<br />

location in the building at the owner's direction. Contractor shall be responsible for all costs<br />

related to the purchase, delivery to the project site and installation <strong>of</strong> one plaque with<br />

hardware, components for which are available from Green Plaque (www.greenplaque.com).<br />

Plaques shall be ordered with the logo, year <strong>of</strong> certification and certification level, in selections<br />

as follow:<br />

1. One (1) 16-inch diameter by 3/4 inches thick Gray Back-Painted Ultra Clear Glass<br />

Plaque.<br />

2. One set <strong>of</strong> aluminum Type AC mounting brackets for the 16-inch diameter plaque (set <strong>of</strong><br />

three brackets).<br />

3. One (1) 5-inch diameter Clear Laser Etched Glass Plaque, Front-Etched.<br />

E. Contractor shall include an allowance <strong>of</strong> $5,000 for signage or other product to comply with<br />

LEED Innovation and Design Credit 1.3 - Educational and Outreach Program. Content <strong>of</strong> the<br />

signage will be provided at project completion.<br />

F. Contractor shall be responsible to achieve the LEED credits identified as "Contractor<br />

Responsibilities" in EXHIBIT 1 - LEED SCORECARD attached at the end <strong>of</strong> this Section.<br />

1.05 ACTION SUBMITTALS:<br />

A. LEED submittals are in addition to other submittals required by other Specification Sections.<br />

If submitted item is identical to that submitted to comply with other requirements, submit<br />

duplicate copies as a separate submittal to verify compliance with indicated LEED<br />

requirements.<br />

B. LEED Documentation Submittals:<br />

1. Prerequisite SS 1: Provide a declaration that the erosion and sedimentation control plan<br />

was carried out in accordance with the contract documents and periodic inspection<br />

018113.13-2 DEAN018113.13.DOC