1957] UNIVERSITY OF ILLINOIS IOI7<br />

ADDITION TO CONTRACT WITH CONSULTING ENGINEERING SERVICE<br />

(16) Consulting Engineering Service, Urbana, has been employed for the engineering<br />

studies and the preparation <strong>of</strong> working drawings for air conditioning<br />

installations in the Illini Union Building under the provisions <strong>of</strong> its contract<br />

approved by the Board <strong>of</strong> Trustees on September 23, 1953.<br />

At the time the project was authorized, the estimated cost <strong>of</strong> the engineering<br />

services was $2,500. Because <strong>of</strong> problems in finding adequate space for ducts<br />

and piping, as well as for additional ventilating equipment in the attic and<br />

extension <strong>of</strong> the installations to serve work spaces and <strong>of</strong>fices in the mezzanine<br />

area, the total cost <strong>of</strong> the engineering services is now estimated at $3,460. All<br />

projects under the contract with Consulting Engineering Service involving<br />

engineering costs in excess <strong>of</strong> $2,500 require the approval <strong>of</strong> the Board, and I<br />

request that the Comptroller be authorized to execute a contract change order<br />

for this work.<br />

On motion <strong>of</strong> Mr. Williamson, the Comptroller was authorized to<br />

execute this change in the contract.<br />

PURCHASES<br />

Purchases Authorized<br />

(17) The following purchase was authorized by the Executive Committee on<br />

recommendation <strong>of</strong> the Director <strong>of</strong> Purchases and the Vice-President and<br />

Comptroller.<br />

Item Department<br />

One Universal X-ray planigraph to be Radiology<br />

delivered and installed in the Department<br />

<strong>of</strong> Radiology<br />

Vendor<br />

Westinghouse X-ray<br />

Division,<br />

Chicago<br />

Cost<br />

$zo 523 00<br />

delivered<br />

and<br />

installed<br />

The following purchases were approved by the Vice-President and Provost, acting<br />

for the President, pursuant to authorization by the Board <strong>of</strong> Trustees to act on<br />

recommendations for purchases under International Cooperation Administration<br />

Contracts. The purchases will be from funds supplied by the International Cooperation<br />

Administration under its contract with the University for educational services<br />

to institutions <strong>of</strong> higher education in India.<br />

Item<br />

Nine wattmeters, dynamometer type,<br />

British standards<br />

Five ammeters, portable precision, 5<br />

amperes, British standards<br />

Eight voltmeters, portable precision,<br />

laboratory type, British standards<br />

One strain gage control assembly, consisting<br />

<strong>of</strong> a six-channel carrier amplifier,<br />

six transducers, inductance type,<br />

and cable accessories; export packed<br />

Thirteen transducers, for detecting<br />

thirteen different forces such as minute<br />

pressures, vibrations, accelerations,<br />

rotary actions, and strains<br />

One oscillator-amplifier, twin channel,<br />

and accessories for evaluating the<br />

transducer signals<br />

One engine dynamometer, o to 300 h.p.<br />

complete with spare parts, tachometer<br />

take-<strong>of</strong>f, torque arm, and control<br />

valves; export packed<br />

One recorder, audio-frequency response<br />

and spectrum, including a beat frequency<br />

oscillator, selective amplifier<br />

and analyzer, and high speed level<br />

recorder; export packed<br />

One potentiometer, recording electronic,<br />

o to 10 millivolts, complete<br />

with accessories and a Selsyn signal<br />

system; export packed<br />

One assembly high pressure (15,000<br />

P.S.I.) laboratory equipment including<br />

gas booster pump, shaking machine,<br />

micro shaker, and accessories;<br />

export packed<br />

Department<br />

International<br />

Cooperation<br />

Administration<br />

Contracts<br />

International<br />

Cooperation<br />

Administration<br />

Contracts<br />

International<br />

Cooperation<br />

Administration<br />

Contracts<br />

International<br />

Cooperation<br />

Administration<br />

Contracts<br />

International<br />

Cooperation<br />

Administration<br />

Contracts<br />

International<br />

Cooperation<br />

Administration<br />

Contracts<br />

International<br />

Cooperation<br />

Ad ministration<br />

Contracts<br />

Vendor<br />

Sangamo Weston<br />

Limited,<br />

Middlesex, England<br />

Heiland Division,<br />

Minneapolis-Honeywell<br />

Regulator Co.,<br />

Denver, Colo.<br />

Vibro-Meter Ltd.,<br />

Fribourg,<br />

Switzerland<br />

Clayton Manufacturing<br />

Co., El Monte, Calif.<br />

Brush Electronics<br />

Co., International<br />

Department,<br />

Cleveland, Ohio<br />

Minneapolis-Honeywell<br />

Regulator Co.,<br />

Peoria<br />

High Pressure<br />

Equipment Co.,<br />

Erie, Pa.<br />

On motion <strong>of</strong> Mr. Herrick, these purchases were approved.<br />

Cost<br />

S 2 956 80<br />

ci.f.<br />

Calcutta,<br />

India<br />

4 685 85<br />

f.a.s.<br />

New York,<br />

N.Y.<br />

5 347 74<br />

c.i.f.<br />

Calcutta,<br />

India<br />

3 525 00<br />

f.o.b.<br />

Los Angeles<br />

Harbor,<br />

Calif.<br />

5 93i 9i<br />

ci.f.<br />

Calcutta,<br />

India<br />

1 854 86<br />

f.a.s.<br />

New York,<br />

N.Y.<br />

5 066 63<br />

f.a.s.<br />

New York,<br />

N.Y.