1957] UNIVERSITY OF ILLINOIS 373<br />

trailer and Secretary <strong>of</strong> the Board were authorized to execute the same.<br />

This action was taken by the following vote: Aye, Mr. Bissell, Mr.<br />

Herrick, Mrs. Holt, Mr. Hughes, Mr. Livingston, Mr. Nickell, Mr.<br />

Swain, Mrs. Watkins; no, none; absent, Mr. Johnston, Mr. Stratton,<br />

Mr. Williamson.<br />

ADDITION TO CONTRACT FOR ENGINEERING SERVICES<br />

ON UTILITIES DISTRIBUTION SYSTEMS<br />

(18) On April 25, 1956, the Board <strong>of</strong> Trustees approved the employment <strong>of</strong><br />

Sargent and Lundy, Consulting Engineers, Chicago, for engineering services in<br />

designing and preparing specifications for utilities to the new residence halls.<br />

The Director <strong>of</strong> the Physical Plant and the Vice-President and Comptroller<br />

recommend an addition to this contract to include services on the extension <strong>of</strong><br />

utilities to the Central Food Stores Building, to be located near the Illinois<br />

Central Railroad tracks.<br />

The estimated cost <strong>of</strong> these services is $5,500 and funds are available in<br />

advances from Housing Division reserves.<br />

I concur and recommend that the Comptroller be authorized to execute<br />

this addition to the contract.<br />

On motion <strong>of</strong> Mrs. Holt, the Comptroller was authorized to execute<br />

this change in the contract.<br />

CHANGE IN CONTRACT WITH VIERLING STEEL WORKS FOR<br />

STRUCTURAL STEEL FOR ABBOTT POWER PLANT ADDITION<br />

(19) On November 23, 1955, the Board <strong>of</strong> Trustees awarded a contract to the<br />

Vierling Steel Works, Chicago, for furnishing, fabricating, and delivering all<br />

structural steel needed for the steel coal bunker for an addition to the Abbott<br />

Power Plant. The contract was based on the unit cost <strong>of</strong> the steel to be provided<br />

at an estimated total cost <strong>of</strong> $66,518.<br />

When bids were received for the superstructure work in June, 1956, it<br />

was found that the funds available are not adequate for the original plans,<br />

necessitating the redesign <strong>of</strong> the addition. Redesign <strong>of</strong> the superstructure required<br />

the Vierling Steel Works to revise shop details beyond the work contemplated<br />

in the original contract and to purchase certain quantities <strong>of</strong> steel<br />

at warehouse instead <strong>of</strong> mill prices. Some savings will result because <strong>of</strong> a<br />

reduction in the amount <strong>of</strong> steel to be purchased, and the changes require a<br />

net increase <strong>of</strong> $3,013.78 in the original contract. The engineers for this project<br />

and the Physical Plant Department have carefully checked this revision and<br />

advise that the additional charge is reasonable.<br />

The Director <strong>of</strong> the Physical Plant and the Vice-President and Comptroller<br />

recommend an increase <strong>of</strong> $3,013.78 in the contract with Vierling Steel Works.<br />

Funds are available in the state appropriation for the addition to the Abbott<br />

Power Plant.<br />

I concur and recommend that the Comptroller be authorized to execute<br />

this change in the contract.<br />

On motion <strong>of</strong> Mr. Swain, the Comptroller was authorized to execute<br />

this change in the contract.<br />

VISIT OF THE GENERAL ASSEMBLY<br />

(20) The General Assembly <strong>of</strong> Illinois will make its biennial visit to the University<br />

<strong>of</strong> Illinois at Urbana-Champaign for the purpose <strong>of</strong> inspection on May<br />

0 and 10. It is expected that the delegation will arrive on the campus late<br />

Thursday afternoon, May 9, and will leave Friday afternoon, May 10. The usual<br />

organization has been set up for the reception, hospitality, and inspection. It<br />

is hoped that as many members <strong>of</strong> the Board <strong>of</strong> Trustees as can do so will<br />

participate in the events <strong>of</strong> inspection and visit.<br />

UNIVERSITY OF ILLINOIS LEGISLATION<br />

(21) It is recommended that the Board <strong>of</strong> Trustees authorize the President<br />

and other University <strong>of</strong>ficials to secure the introduction in the Seventieth<br />

General Assembly <strong>of</strong> Illinois <strong>of</strong> bills for the following legislation, in accord<br />

with Board action, and to support their enactment:

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!