n8 BOARD OF TRUSTEES [October 22<br />

ston, Mr. Livingston, Mr. Megran, Mr. Swain, Mrs. Watkins, Mr.<br />

Williamson; no, none; absent, Mr. Nickell, Mr. Stratton.<br />

CHANGES IN CONTRACTS AND ADDITIONAL APPROPRIATION<br />

FOR ALTGELD HALL REMODELING<br />

(9) The Committee on Nonrecurring Appropriations recommends an additional<br />

appropriation <strong>of</strong> $5,300 for further remodeling <strong>of</strong> space on the second floor <strong>of</strong><br />

Altgeld Hall for use by the Mathematics Department.<br />

I concur and recommend that the Comptroller be authorized to execute a<br />

change order increasing by $2,681.02 the contract with Schroeder and Sons, for<br />

plumbing and heating work and minor changes in other existing contracts for<br />

the remodeling <strong>of</strong> Altgeld Hall.<br />

On motion <strong>of</strong> Mr. Williamson, an appropriation <strong>of</strong> $5,300 was made<br />

from the General Reserve Fund for this purpose, and the Comptroller<br />

was authorized to execute changes in the contracts for this remodeling,<br />

as recommended. This action was taken by the following vote: Aye,<br />

Mr. Bissell, Mr. Herrick, Mrs. Holt, Mr. Johnston, Mr. Livingston,<br />

Mr. Megran, Mr. Swain, Mrs. Watkins, Mr. Williamson; no, none;<br />

absent, Mr. Nickell, Mr. Stratton.<br />

CONTRACTS FOR CONSTRUCTION OF BIOLOGY BUILDING<br />

(10) When contracts for the construction <strong>of</strong> the Biology Building were awarded,<br />

action on the contracts for the elevator and dumb-waiter installations was deferred,<br />

pending negotiations with the lowest bidders to determine whether they would<br />

execute contracts subject to availability <strong>of</strong> funds.<br />

The Hollister-Whitney Company, Quincy, Illinois, lowest bidder on the elevators<br />

($58,725), is not willing to execute a contract on this basis. The firm <strong>of</strong><br />

Gallaher and Speck, Inc., Chicago, lowest bidder on the dumb-waiter installations,<br />

is willing to extend the time <strong>of</strong> the contract, but at an increase in price from<br />

$4,200 to $4,587. The Long Elevator and Machine Company <strong>of</strong> Springfield, Illinois,<br />

the second lowest bidder, submitted a bid <strong>of</strong> $63,893 on both the elevator and<br />

dumb-waiter installations. This firm is willing to execute a contract, subject to<br />

availability <strong>of</strong> funds after July, 1957, and before August 1, 1957, provided that it<br />

will be reimbursed for the actual cost <strong>of</strong> preparing shop drawings needed by other<br />

contractors and for incidental expenses not to exceed $1,960 in the event funds<br />

are not available to proceed with the elevator and dumb-waiter installations.<br />

The Director <strong>of</strong> the Physical Plant and the Vice-President and Comptroller<br />

recommend award <strong>of</strong> a contract to the Long Elevator and Machine Company on<br />

this basis. I concur and recommend that the Comptroller and the Secretary <strong>of</strong> the<br />

Board be authorized to execute such a contract.<br />

On motion <strong>of</strong> Mr. Swain, the contract for the elevator and dumbwaiter<br />

installations in the Biology Building was awarded, as recommended;<br />

all other bids on these installations were rejected; and the<br />

Comptroller and Secretary <strong>of</strong> the Board were authorized to execute the<br />

contract so awarded. This action was taken by the following vote: Aye,<br />

Mr. Bissell, Mr. Herrick, Mrs. Holt, Mr. Johnston, Mr. Livingston,<br />

Mr. Megran, Mr. Swain, Mrs. Watkins, Mr. Williamson; no, none;<br />

absent, Mr. Nickell, Mr. Stratton.<br />

CONTRACT FOR REMODELING IN THE RESEARCH AND<br />

EDUCATIONAL HOSPITALS FOR THE DEPARTMENT<br />

OF OBSTETRICS AND GYNECOLOGY<br />

(11) The Director <strong>of</strong> the Physical Plant and the Vice-President and Comptroller<br />

recommend award <strong>of</strong> a contract for $128,892 to Russell Mansfield, Chicago, Illinois,<br />

the lowest bidder, for remodeling in the Research and Educational Hospitals for<br />

the Department <strong>of</strong> Obstetrics and Gynecology.<br />

The work will consist <strong>of</strong> remodeling an area on the first floor for use by the<br />

Department as a clinic, and will include construction <strong>of</strong> a floor in the waiting<br />

area now two stories high, rearrangement <strong>of</strong> partitions, lighting improvements, and