532 BOARD OF TRUSTEES [July 16<br />

$22,500 for studies, plus drafting room salaries, plus 100 per cent for the work<br />

done thereafter, also<br />

No payments above the $22,500 are to be made prior to August I, 1957.<br />

Housing Building at Robert Allerton Park—Smith, Kratz, and Associates, Urbana<br />

This will be a low cost twelve-unit motel type <strong>of</strong> one-story lodging building<br />

adjacent to Allerton House, and so located that an additional unit may be<br />

added at a later date.<br />

The firm <strong>of</strong> Smith, Kratz, and Associates has designed many projects in<br />

collegiate Gothic, Classical, and Georgian styles. They propose to employ<br />

engineering consultants for such incidental mechanical services as may be<br />

necessary. This firm has proposed a standard fee <strong>of</strong> 6 per cent <strong>of</strong> construction<br />

costs for complete services, with the understanding that the firm will be<br />

reimbursed for all travel expenses and will not provide a clerk-<strong>of</strong>-the-works<br />

type <strong>of</strong> superintendence, only periodic visits to the project as may be necessary.<br />

The estimated cost <strong>of</strong> this project is $40,000.<br />

Architectural Consultant and Designer — Ambrose M. Richardson <strong>of</strong> Ambrose M.<br />

Richardson and Associates<br />

The University had a contract with this firm during the year 1956-57 for the<br />

following services:<br />

a. Building studies on a women's residence hall with a capacity <strong>of</strong> approximately<br />

1,000.<br />

b. Building studies on the first unit <strong>of</strong> a new Fine Arts Center.<br />

c. Campus plan studies at Urbana-Champaign.<br />

d. Completion <strong>of</strong> services on the men's residence halls project to be constructed<br />

on the Parade Ground area.<br />

e. Consultative services on the building design <strong>of</strong> the Plant Sciences Building,<br />

family housing project, Central Food Stores Building, Mini Union Addition.<br />

In addition, Mr. Richardson has constributed substantially to the design<br />

<strong>of</strong> the Physics Building, the Residence Hall for Unmarried Graduate Men,<br />

and the Digital Computer Laboratory.<br />

The services <strong>of</strong> his firm have been highly satisfactory, and it is proposed that<br />

the firm be employed for another year beginning August 1, 1957, for the<br />

following services:<br />

a. Building studies for men's residence halls with a capacity approximately<br />

1,000 (Residence Halls for Single Undergraduate Men, Stage 4, scheduled<br />

for completion in 1960-62).<br />

b. Building studies on a women's residence hall with a capacity approximating<br />

750 (Residence Halls for Single Undergraduate Women, Stage 3, scheduled<br />

for completion in 1961).<br />

c. Continuing services on projects on which Mr. Richardson has already presented<br />

building designs (Fine Arts Center, Men's Residence Halls, Stages<br />

2 and 3, and Women's Residence Halls, Stage 2).<br />

d. Continuation <strong>of</strong> campus plan studies at Urbana-Champaign.<br />

e. Consultative services on the design <strong>of</strong> projects on which plans and specifications<br />

will be prepared by other architects.<br />

Compensation for these services will be as follows:<br />

a. Men's Residence Halls — $21,000 — to be advanced from funds available to<br />

the Housing Division and ultimately reimbursed from borrowed funds on<br />

construction.<br />

b. Women's Residence Hall — $13,000 — to be advanced from funds available<br />

to the Housing Division and ultimately reimbursed from borrowed funds<br />

on construction.<br />

c. Continuing services on housing projects and Fine Arts Center — $1,500 —<br />

to be charged against the funds available for construction.<br />

d. Campus plan studies and consultative services — $13,000 — to be financed<br />

from a nonrecurring appropriation.<br />

I concur.<br />

On motion <strong>of</strong> Mr. Johnston, the foregoing recommendations were<br />

approved, and the Comptroller and the Secretary <strong>of</strong> the Board were<br />

authorized to execute the necessary contracts.