8go BOARD OF TRUSTEES [September 19<br />

Physical Plant<br />

Remodeling gallery for Architecture and Art 800<br />

Drill Hall repairs 20 000 20 800<br />

Total, Chicago Undergraduate Division (36 426)<br />

Grand Total $958 937"<br />

On motion <strong>of</strong> Mr. Williamson, these reappropriations were made<br />

by the following vote: Aye, Mr. Bissell, Mr. Herrick, Mrs. Holt, Mr.<br />

Hughes, Mr. Johnston, Mr. Livingston, Mr. Nickell, Mr. Swain, Mrs.<br />

Watkins, Mr. Williamson; no, none; absent, Mr. Stratton.<br />

CONTRACT FOR ADDITION TO THE LIBRARY<br />

(14) The Director <strong>of</strong> the Library, the Director <strong>of</strong> the Physical Plant, and the<br />

Vice-President and Comptroller recommend award <strong>of</strong> a contract for $696,500 to<br />

Johnson, Drake, and Piper, Inc., Terre Haute, Indiana, for the construction <strong>of</strong><br />

the sixth addition to the Library. This includes all <strong>of</strong> the mechanical trades as<br />

well as the general work.<br />

Funds are available in the state capital appropriations for 1957-59.<br />

Johnson, Drake, and Piper, Inc., is a large national contracting corporation<br />

with home <strong>of</strong>fices in Minneapolis, Minnesota, and branch <strong>of</strong>fices in New York,<br />

California, and Indiana. The bid on this project was submitted by the Terre<br />

Haute branch which has been in operation over forty years.<br />

The bid instructions provided for certain alternates:<br />

A. Deduction if a bookstack manufacturer's design <strong>of</strong> structural framing system<br />

is used in lieu <strong>of</strong> the structural framing system shown in the building design,<br />

or<br />

B. Deduction if a bookstack manufacturer's design <strong>of</strong> framing system and<br />

cellular steel floors with linoleum is used in lieu <strong>of</strong> framing system and concrete<br />

floors shown in the building design;<br />

C. Addition for open bar type shelving in lieu <strong>of</strong> solid plate shelving;<br />

D. Deduction if new toilet facilities are omitted;<br />

E. Addition for alterations in heating and temperature control systems.<br />

The Director <strong>of</strong> the Library and the other recommending <strong>of</strong>ficers concerned<br />

recommend acceptance <strong>of</strong> alternates A, C, and E. On the basis <strong>of</strong> summation <strong>of</strong><br />

the base bids and the recommended alternates, Johnson, Drake, and Piper, Inc.,<br />

is the lowest bidder.<br />

I concur and recommend that the Comptroller and the Secretary <strong>of</strong> the<br />

Board be authorized to execute this contract.<br />

On motion <strong>of</strong> Mrs. Watkins, these contracts were awarded, as recommended,<br />

and the Comptroller and the Secretary <strong>of</strong> the Board were<br />

authorized to execute the same. This action was taken by the following<br />

vote: Aye, Mr. Bissell, Mr. Herrick, Mrs. Holt, Mr. Hughes, Mr.<br />

Johnston, Mr. Livingston, Mr. Nickell, Mr. Swain, Mrs. Watkins, Mr.<br />

Williamson; no, none; absent, Mr. Stratton.<br />

ADDITION TO CONTRACT FOR MEN'S RESIDENCE HALLS<br />

(15) The Director <strong>of</strong> the Physical Plant and the Vice-President and Comptroller<br />

recommend an addition <strong>of</strong> $4,433 to the contract with Felmley-Dickerson Company<br />

for construction <strong>of</strong> the Residence Halls which are being built on the<br />

northwest area <strong>of</strong> the former Parade Grounds. After additions three and four<br />

to the Men's Residence Halls were constructed it was discovered that the<br />

"Haydite" block partitions are not suitable sound barriers unless treated. This<br />

contract change provides for brushing on the first coat <strong>of</strong> paint, rather than<br />

spraying, and changing the back-to-back electrical outlet boxes to vertically<br />

stacked boxes to reduce sound transmission.<br />

I concur and recommend that the Comptroller be authorized to execute the<br />

contract change order.<br />

On motion <strong>of</strong> Mr. Swain, the Comptroller was authorized to execute<br />

this change in the contract.