534 BOARD OF TRUSTEES [July 16<br />

I concur and recommend that the Comptroller and the Secretary <strong>of</strong> the Board<br />

be authorized to execute this contract, subject to release <strong>of</strong> funds.<br />

On motion <strong>of</strong> Mr. Johnston, this contract was awarded, and the<br />

Comptroller and the Secretary <strong>of</strong> the Board were authorized to execute<br />

the same, subject to release <strong>of</strong> funds. This action was taken by the<br />

following vote: Aye, Mr. Bissell, Mrs. Holt, Mr. Hughes, Mr. Johnston,<br />

Mr. Livingston, Mr. Nickell, Mrs. Watkins, Mr. Williamson; no,<br />

none; absent, Mr. Herrick, Mr. Stratton, Mr. Swain.<br />

CONTRACTS FOR EQUIPMENT FOR ABBOTT<br />

POWER PLANT ADDITION<br />

(29) The Director <strong>of</strong> the Physical Plant and the Vice-President and Comptroller<br />

recommend awards <strong>of</strong> contracts for items <strong>of</strong> equipment and structural steel for<br />

the Abbott Power Plant addition (unit 6) as follows, the award in each case<br />

being to the lowest bidder:<br />

Turbine Generator Unit and Electrical Equipment (Division "7-B")<br />

Base Bid Maximum Cost<br />

General Electric Company S631 000 $694 100<br />

840 South Canal Street Subject to 10<br />

Chicago 80, Illinois per cent<br />

escalation<br />

Condensing Equipment (Division " 7-C")<br />

Worthington Corporation 80 700 88 770<br />

400 West Madison Street Subject to 10<br />

Chicago 6, Illinois per cent<br />

escalation<br />

All bids on the turbine generator unit and electrical equipment, and on the<br />

condensing equipment are subject to adjustment upward or downward for<br />

changes in labor and material costs at the time shipments are due (balance due<br />

after the date <strong>of</strong> shipment is adjusted as <strong>of</strong> the date <strong>of</strong> shipment), a provision<br />

generally adopted by the industry. Bid prices are f.o.b. Abbott Power Plant.<br />

Structural Steel (Division " 7-D")<br />

Unit Prices per Pound for<br />

Hansell-Elcock Company Structural Bracing Column<br />

485 West 23rd Place Steel Members Members Anchor Bolts<br />

Chicago 16, Illinois 35 tons 4 tons 0.2 tons<br />

?.i65 J.2065 $.30<br />

All <strong>of</strong> these prices are firm for the structural steel furnished and are f.o.b.<br />

Abbott Power Plant.<br />

Based on the bid prices per pound and the estimated quantities <strong>of</strong> structural<br />

steel required, the total cost will be approximately:<br />

Structural Members, 35 tons $11 55°<br />

Trusses and Bracing Members, 4 tons 1 652<br />

Column Anchor Bolts, 0.2 tons 120<br />

Total $13 32 2<br />

The quantities <strong>of</strong> the various classifications <strong>of</strong> structural steel are based on preliminary<br />

estimates <strong>of</strong> requirements and the total tonnage to be purchased may<br />

vary from those established by 10 per cent or more when detailed drawings<br />

are developed.<br />

Sargent and Lundy, Chicago, consulting engineers for this project, have reviewed<br />

all bids received and report that the proposal <strong>of</strong> the lowest bidder in each<br />

case is in line with estimates <strong>of</strong> costs and complies with bidding requirements in all<br />

respects.<br />

Funds for this equipment and installations are available in the state appropriation<br />

"For an addition to the Power and Heating Plant, with fixed equipment<br />

installed, including plans and specifications, extension <strong>of</strong> utilities to the building,<br />

and all other necessary costs and charges incident to the completion <strong>of</strong> the work,<br />

subject to release by the Governor.