1957] UNIVERSITY OF ILLINOIS 371<br />

It is further hereby resolved by this Board <strong>of</strong> Trustees that the necessary<br />

and appropriate action be taken for the acquisition <strong>of</strong> title to said property by<br />

said The Board <strong>of</strong> Trustees <strong>of</strong> the University <strong>of</strong> Illinois and to have the compensation<br />

to be paid therefor determined by the institution and prosecution to<br />

completion <strong>of</strong> a proceeding in eminent domain in a court <strong>of</strong> competent jurisdiction<br />

and that the Legal Counsel <strong>of</strong> the University be and he is hereby authorized<br />

to proceed accordingly, to institute and prosecute an eminent domain proceeding<br />

in the name <strong>of</strong> The Board <strong>of</strong> Trustees <strong>of</strong> the University <strong>of</strong> Illinois for the<br />

acquisition <strong>of</strong> said land and the determination <strong>of</strong> the compensation to be paid by<br />

it therefor, and to employ such special legal counsel, appraisers and others as<br />

he may deem necessary or desirable to assist him in the institution and prosecution<br />

<strong>of</strong> said proceeding.<br />

On motion <strong>of</strong> Mrs. Watkins, the foregoing resolution was adopted<br />

by the following vote: Aye, Mr. Bissell, Mr. Herrick, Mrs. Holt, Mr.<br />

Hughes, Mr. Livingston, Mr. Nickell, Mr. Swain, Mrs. Watkins; no,<br />

none; absent, Mr. Johnston, Mr. Stratton, Mr. Williamson.<br />

EMPLOYMENT OF SPECIAL COUNSEL FOR<br />

CONDEMNATION PROCEEDINGS<br />

(13) Due to the large volume <strong>of</strong> work in the Legal Counsel's <strong>of</strong>fice at this time,<br />

it will not be feasible for him and his staff to devote all <strong>of</strong> the time required<br />

to the condemnation proceedings to acquire the property at 204 South Goodwin<br />

Avenue, 1012 West Green Street, 1102 West Green Street, and 1106 West Illinois<br />

Street, Urbana, Illinois, as sites needed for further University buildings.<br />

Accordingly, it is requested that the Board <strong>of</strong> Trustees authorize employment<br />

<strong>of</strong> the law firm <strong>of</strong> Thomas, Mulliken, and Mamer, Champaign, Illinois, to<br />

institute and prosecute the proceedings for the acquisition by the University <strong>of</strong><br />

these properties, subject to the supervision <strong>of</strong> the Legal Counsel. It is also<br />

requested that the Director <strong>of</strong> the Physical Plant and the Legal Counsel be<br />

authorized to employ appraisers and other real estate experts who in their judgment<br />

may be needed in these proceedings.<br />

On motion <strong>of</strong> Mrs. Holt, authority was granted as requested above.<br />

CONTRACT FOR AIR CONDITIONING IN EAST<br />

DENTISTRY-MEDICINE-PHARMACY BUILDING<br />

(14) The Director <strong>of</strong> the Physical Plant and the Vice-President and Comptroller<br />

recommend award <strong>of</strong> a contract for $186,988 to Reliable Sheet Metal Works,<br />

Inc., Chicago, the lowest bidder, for air conditioning in the East Dentistry-<br />

Medicine-Pharmacy Building at the Chicago Pr<strong>of</strong>essional Colleges.<br />

The work will consist <strong>of</strong> installation <strong>of</strong> air-conditioning equipment to serve<br />

the entire first floor <strong>of</strong> the building (with the exception <strong>of</strong> the Manufacturing<br />

Pharmacy area), the south half <strong>of</strong> the second, third, fourth, and fifth floors, and<br />

the northwest quarter <strong>of</strong> the second and third floors.<br />

Funds are available in the state appropriation for 1955-57 for the East<br />

Dentistry-Medicine-Pharmacy Building Addition.<br />

I concur and recommend that the Comptroller and the Secretary <strong>of</strong> the<br />

Board be authorized to execute this contract.<br />

On motion <strong>of</strong> Mrs. Watkins, this contract was awarded, and the<br />

Comptroller and Secretary <strong>of</strong> the Board were authorized to execute<br />

the same.<br />

CONTRACT FOR REPLACEMENT OF AIR-CONDITIONING UNIT IN THE<br />

ANIMAL HOSPITAL AT THE CHICAGO PROFESSIONAL COLLEGES<br />

(15) The Director <strong>of</strong> the Physical Plant and the Vice-President and Comptroller<br />

recommend award <strong>of</strong> a contract for $3,985 to Reliable Sheet Metal Works, Inc.,<br />

Chicago, the lowest bidder, for replacement <strong>of</strong> the air-conditioning unit in<br />

Room 540 <strong>of</strong> the Animal Hospital at the Chicago Pr<strong>of</strong>essional Colleges.<br />

The work will consist <strong>of</strong> removal <strong>of</strong> a small, obsolete air-conditioning unit<br />

and installation <strong>of</strong> a new, larger system to serve Rooms 538 and 538B in addition<br />

to Room 540. These rooms must be maintained at controlled temperatures