126 BOARD OF TRUSTEES [October 22<br />

On motion <strong>of</strong> Mr. Bissell, these contracts were awarded as recommended,<br />

and the Comptroller and Secretary <strong>of</strong> the Board were authorized<br />

to execute the same; and assignments <strong>of</strong> $156,000 from the General<br />

Reserve Fund and $9,000 from laundry operations reserves were made<br />

and allocated to the various contracts for purposes as specified. This<br />

action was taken by the following vote: Aye, Mr. Bissell, Mr. Herrick,<br />

Mrs. Holt, Mr. Johnston, Mr. Livingston, Mr. Megran, Mr. Swain,<br />

Mrs. Watkins; no, none; absent, Mr. Nickell, Mr. Stratton; not voting,<br />

Mr. Williamson.<br />

ARCHITECTURAL SERVICES<br />

Mr. Livingston suggested that in the future all recommendations for<br />

the employment <strong>of</strong> architects and engineers on University building<br />

projects be submitted to the appropriate committee <strong>of</strong> the Board <strong>of</strong><br />

Trustees for its consideration before being presented to the Board.<br />

Although not <strong>of</strong>fered as a motion, this suggestion was accepted for<br />

record, and the Secretary <strong>of</strong> the Board was requested to notify all University<br />

<strong>of</strong>ficers concerned. President Megran designated the Committee<br />

on Buildings and Grounds for this purpose.<br />

CONTRACT FOR ENGINEERING SERVICES ON ABBOTT POWER<br />

PLANT ADDITION AND UTILITY DISTRIBUTION SYSTEMS<br />

(20) Sargent and Lundy, Engineers, Chicago, designed the Abbott Power Plant<br />

and the major portion <strong>of</strong> the utility distribution systems. Their services have been<br />

highly satisfactory, and it is desirable that they be employed as engineers to design<br />

the Abbott Power Plant addition and extensions <strong>of</strong> the utility distribution systems<br />

proposed for the 1957-59 biennium according to the following terms and instructions<br />

:<br />

Abbott Power Plant Addition. Prepare specifications, take bids, analyze bids,<br />

and submit recommendations prior to July I, 1957, for purchase <strong>of</strong> the major items<br />

<strong>of</strong> equipment, viz., turbine, condenser, and cooling tower which will determine<br />

ultimate design <strong>of</strong> the addition. Charges for services will be based on salaries and<br />

wages paid for engineering and drafting work, plus 100 per cent there<strong>of</strong> for<br />

commission, plus cost <strong>of</strong> clerical and stenographic services and incidental expenses<br />

incurred by Sargent and Lundy. In the event <strong>of</strong> termination <strong>of</strong> contract before<br />

completion at the request <strong>of</strong> the University, Sargent and Lundy will bill the<br />

University for services on the above basis. If funds are available and the University<br />

approves proceeding with the project, Sargent and Lundy will enter into its<br />

usual engineering service agreement with- the University at the same rates as<br />

under the present agreement and credit the University with one-half <strong>of</strong> the 100<br />

per cent overhead charges referred to above.<br />

Utility Distribution Systems. Furnish complete engineering services as requested<br />

for extensions <strong>of</strong> the utility distribution systems, including preparation <strong>of</strong><br />

plans and specifications, taking <strong>of</strong> bids, analyzing bids, and submitting recommendations<br />

prior to July 1, 1957, for award <strong>of</strong> contracts for the two extensions <strong>of</strong> the<br />

systems which are required for the minimum program now proposed, viz.,<br />

a. Extension <strong>of</strong> steam tunnel and piping from the intersection <strong>of</strong> Gregory<br />

Drive and Oak Street, south on Oak Street to Peabody Drive extended,<br />

and east on Peabody Drive to intersection with existing tunnel at Euclid<br />

Street.<br />

b. Construction <strong>of</strong> a new 2,000 KVA load center at or in the vicinity <strong>of</strong> the<br />

intersection <strong>of</strong> Peabody Drive and First Street; underground duct to<br />

Stadium Drive; installation <strong>of</strong> a normal feeder cable and a reserve feeder<br />

cable from the load center to Abbott Power Plant; switchgear at Abbott<br />

Power Plant; and transfer <strong>of</strong> Law Building and Stadium cables to the<br />

new load center.<br />

Engineering services furnished prior to July 1, 1957, for the foregoing work<br />

will be charged on the same basis as specified for the Abbott Power Plant addition.