948 BOARD OF TRUSTEES [October 29<br />

additional term <strong>of</strong> ten years providing that the University determines at the end <strong>of</strong><br />

the first ten-year term or within ninety calendar days prior thereto that such use<br />

for a second term <strong>of</strong> ten years will not interfere with University plans for development<br />

and use <strong>of</strong> University property.<br />

On motion <strong>of</strong> Mr. Swain, the foregoing resolution was adopted bv<br />

the following vote: Aye, Mr. Bissell, Mr. Herrick, Mrs. Holt, Mr.<br />

Hughes, Mr. Johnston, Mr. Livingston, Mr. Nickell, Mr. Swain, Mrs.<br />

Watkins, Mr. Williamson; no, none; absent, Mr. Stratton.<br />

ENGINEERING SERVICES ON AIRPORT ADMINISTRATION<br />

BUILDING AND CONTROL TOWER<br />

(16) On June 20, 1957, the Board <strong>of</strong> Trustees authorized a contract with Consulting<br />

Engineering Services for engineering services as needed, with the stipulation<br />

that all projects over $2,500 are subject to approval by the Board <strong>of</strong> Trustees.<br />

The Director <strong>of</strong> the Physical Plant Department and the Vice-President and<br />

Comptroller recommend employment <strong>of</strong> Consulting Engineering Services to do the<br />

mechanical and electrical engineering work on the Airport Administration Building<br />

and Control Tower at an estimated cost <strong>of</strong> $4,500. This project will be paid<br />

for by the State Department <strong>of</strong> Aeronautics, but the University is required to<br />

prepare plans and specifications, for which reimbursement will be received after<br />

approval <strong>of</strong> the plans by the Civil Aeronautics Authority.<br />

I concur and recommend that the Comptroller be authorized to issue the<br />

contract change order.<br />

On motion <strong>of</strong> Mr. Hughes, the Comptroller was authorized to execute<br />

this change in the contract.<br />

CONTRACT FOR LABORATORY FURNITURE FOR<br />

CHICAGO PROFESSIONAL COLLEGES<br />

(17) The Business Manager <strong>of</strong> the Chicago Pr<strong>of</strong>essional Colleges, the Director <strong>of</strong><br />

the Physical Plant Department, and the Vice-President and Comptroller recommend<br />

award <strong>of</strong> a contract for $19,926.06 to the Browne-Morse Company, Muskegon,<br />

Michigan, the lowest bidder, for the manufacture and installation <strong>of</strong><br />

laboratory furniture for the Chicago Pr<strong>of</strong>essional Colleges. This will include<br />

fabricating and installing twenty-six pieces <strong>of</strong> laboratory furniture, consisting <strong>of</strong><br />

laboratory sinks, benches, drying racks, and accessories for Anesthesiology, X-ray<br />

Therapy, the Tumor Clinic in the Research and Educational Hospitals, and lecture<br />

and preparatory rooms in the East Dentistry-Medicine-Pharmacy Building.<br />

Funds are available in the state capital appropriations for 1957-59.<br />

I concur and recommend that the Comptroller and the Secretary oi the Board<br />

be authorized to execute this contract.<br />

On motion <strong>of</strong> Mrs. Watkins, this contract was awarded, and the<br />

Comptroller and the Secretary <strong>of</strong> the Board were authorized to execute<br />

the same.<br />

STEAM SERVICE TO THE NATIONAL SOCIETY FOR CRIPPLED<br />

CHILDREN AND ADULTS IN THE MEDICAL CENTER DISTRICT<br />

(18) The National Society for Crippled Children and Adults is constructing a<br />

building at 2023-55 West Ogden Avenue, Chicago, Illinois. The Society has applied<br />

to the University <strong>of</strong> Illinois for steam service from the Medical Center Steam<br />

Company plant to the extent <strong>of</strong> 1,600 pounds an hour.<br />

The steam plant has the capacity to supply the steam needed by the National<br />

Society without capital additions to the plant proper. The supplying <strong>of</strong> steam to<br />

the National Society would make it unnecessary for the Society to construct its<br />

own steam plant in connection with its building and, at the same time, would result<br />

in some savings in operating costs, not only to the National Society as against<br />

building its own plant, but also to other users now taking steam from the Medical<br />

Center Steam Company, as well as to the University.<br />

Accordingly, the Director <strong>of</strong> the Physical Plant Department and the Vice-<br />

President and Comptroller recommend that the University enter into an agreement<br />

with the National Society to furnish the steam requested on the following basis.