1957] UNIVERSITY OF ILLINOIS 90I<br />

in each case is in line with estimates for this portion <strong>of</strong> the work on both <strong>of</strong><br />

the projects and complies with bidding requirements in all respects.<br />

Funds are available in the state appropriation "For construction <strong>of</strong> extensions<br />

to the general University utilities distribution system, including plans and<br />

specifications and all other necessary costs and charges incident to the completion<br />

<strong>of</strong> the work," subject to release by the Governor, and in surplus funds <strong>of</strong><br />

the Housing Division. Housing funds will be used to pay the cost <strong>of</strong> steam and<br />

electric lateral extensions (total estimated cost $27,454) to the Central Food<br />

Stores Building.<br />

Hold orders will be issued on the work to be done on the laterals to the<br />

Central Food Stores Building until the financing <strong>of</strong> this building has been<br />

arranged and bids for its construction secured. In the event construction <strong>of</strong> this<br />

building is deferred until after completion <strong>of</strong> the foregoing contracts, change<br />

orders will be issued to the respective contractors to secure credit for omission<br />

<strong>of</strong> the laterals.<br />

I recommend these contracts be awarded, as recommended, subject to the<br />

release <strong>of</strong> funds and with the provision that if construction <strong>of</strong> the Central Food<br />

Stores Building does not proceed on schedule, credit will be allowed for omitted<br />

work, and that the Comptroller and the Secretary <strong>of</strong> the Board be authorized<br />

to execute these contracts.<br />

On motion <strong>of</strong> Mrs. Watkins, these contracts were awarded, as recommended,<br />

and the Comptroller and the Secretary <strong>of</strong> the Board were authorized to execute<br />

the same. This action was taken by the following vote: Aye, Mr. Johnston,<br />

Mr. Livingston, Mrs. Watkins; no, none; absent, none.<br />

Contracts for Construction <strong>of</strong> Sanitary Sewer for Biology Building<br />

(2) In August, 1056, bids were received for the construction <strong>of</strong> a sanitary<br />

sewer in Mathews Avenue to serve the Biology Building. Only one bid was<br />

received on the general work, which is the principal part <strong>of</strong> the project, and<br />

because this bid was so much higher than engineering estimates, all bids were<br />

rejected and this part <strong>of</strong> the work on the Biology Building was deferred.<br />

The following new bids were received on July 23, 1957.<br />

Electrical work — Brunkow Electric Company, Champaign $ 3 723 00<br />

Pipe work — Paul H. McWilliams, Champaign 20 144 00<br />

Pump installations — Fairbanks Morse and Company, Chicago 4 300 90<br />

Chicago Pump Company, Chicago 4 635 00<br />

A number <strong>of</strong> other contractors took sets <strong>of</strong> drawings and specifications for<br />

the purpose <strong>of</strong> preparing bids but the above were the only bidders. No bids<br />

were received on the general work.<br />

The Director <strong>of</strong> the Physical Plant and the Vice-President and Comptroller<br />

recommend that the bids <strong>of</strong> Brunkow Electric Company for the electrical work,<br />

Paul H. McWilliams for the pipe work, and the lower bid <strong>of</strong> Fairbanks Morse<br />

and Company for pump installations be accepted and held pending the taking<br />

<strong>of</strong> new bids for the general work, which have been called for on August 14,<br />

1957. The time required to advertise for bids under the new state law prevented<br />

obtaining bids at an earlier date.<br />

A further report and recommendation on this project will be submitted to<br />

the Executive Committee when bids on the general work have been secured.<br />

I recommend that in the meantime the Executive Committee approve the award<br />

<strong>of</strong> contracts to Brunkow Electric Company, Paul H. McWilliams, and Fairbanks<br />

Morse and Company, the lowest bidders, provided that it is feasible to proceed<br />

with the construction <strong>of</strong> the sanitary sewer on the basis <strong>of</strong> the lowest bid<br />

received on the general work. A report <strong>of</strong> the bids received on the general work<br />

and a recommendation will be submitted to the Executive Committee by mail. It<br />

m ay not be necessary for the Committee to hold another meeting if it finds that<br />

the lowest bid on the general work is acceptable and the Committee wishes<br />

to authorize the award <strong>of</strong> that contract by mail and regard such action as a<br />

deferred part <strong>of</strong> the proceedings <strong>of</strong> today's meeting.<br />

On motion <strong>of</strong> Mr. Johnston, these recommendations were approved by the<br />

following vote: Aye, Mr. Johnston, Mr. Livingston, Mrs. Watkins; no, none;<br />

absent, none.