18.12.2012 Views

university of illinois - UIHistories Project

university of illinois - UIHistories Project

university of illinois - UIHistories Project

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1282 BOARD OF TRUSTEES [June 19<br />

Form ACA-1632 (3-56)<br />

DEPARTMENT OF COMMERCE<br />

CIVIL AERONAUTICS ADMINISTRATION<br />

WASHINGTON 25<br />

GRANT AGREEMENT<br />

Part I —Offer<br />

Date <strong>of</strong> Offer: June 13, 1958<br />

University <strong>of</strong> Illinois Airport<br />

<strong>Project</strong> No. 9-11-026-5802<br />

Contract Serial No. C3ca-i394A<br />

To: The Board <strong>of</strong> Trustees <strong>of</strong> the University <strong>of</strong> Illinois and the State <strong>of</strong> Illinois<br />

acting by and through its Department <strong>of</strong> Aeronautics (herein referred to as<br />

the "Co-Sponsors")<br />

FROM: The United States <strong>of</strong> America (acting through the Administrator <strong>of</strong> Civil<br />

Aeronautics, herein referred to as the "Administrator")<br />

WHEREAS, the Co-Sponsors have submitted to the Administrator a <strong>Project</strong> Application<br />

dated February 21, 1958, for a Grant <strong>of</strong> Federal funds for a project for<br />

development <strong>of</strong> the University <strong>of</strong> Illinois Airport (herein called the "Airport"),<br />

together with plans and specifications for such project, which <strong>Project</strong> Application,<br />

as approved by the Administrator, is hereby incorporated herein and made a part<br />

here<strong>of</strong>; and<br />

WHEREAS, the Administrator has approved a project for the development <strong>of</strong> the<br />

Airport (herein called the "<strong>Project</strong>") consisting <strong>of</strong> the following described airport<br />

development:<br />

Construct unit <strong>of</strong> administration building with<br />

utilities; Construct control tower with utilities;<br />

Relocate beacon, (This is in addition to the development<br />

included in <strong>Project</strong> No. 9-11-026-101.)<br />

all as more particularly described in the property map and plans and specification?<br />

incorporated in the said <strong>Project</strong> Application;<br />

Now therefore, pursuant to and for the purposes <strong>of</strong> carrying out the provisions <strong>of</strong><br />

the Federal Airport Act (60 Stat. 170; Public Law 377, 79th Congress), and in<br />

consideration <strong>of</strong> (a) the Board <strong>of</strong> Trustees <strong>of</strong> the University <strong>of</strong> Illinois' adoption<br />

and ratification <strong>of</strong> the representations and assurances contained in said <strong>Project</strong><br />

Application and acceptance <strong>of</strong> this Offer by the Board <strong>of</strong> Trustees <strong>of</strong> the University<br />

<strong>of</strong> Illinois and the State <strong>of</strong> Illinois, Department <strong>of</strong> Aeronautics as hereinafter<br />

provided and (b) the benefits to accrue to the United States and the public from<br />

the accomplishment <strong>of</strong> the <strong>Project</strong> and the operation and maintenance <strong>of</strong> the Airport,<br />

as herein provided,<br />

The administrator, for and on behalf <strong>of</strong> the United States, hereby <strong>of</strong>fers and agrees<br />

to pay, as the United States' share <strong>of</strong> costs incurred in accomplishing the project,<br />

50 per centum <strong>of</strong> all allowable project costs, subject to the following terms and<br />

conditions:<br />

1. The maximum obligation <strong>of</strong> the United States payable under this Offer shall<br />

be $254,550.00.<br />

2. The Co-Sponsors shall<br />

(a) begin accomplishment <strong>of</strong> the <strong>Project</strong> within a reasonable time alter<br />

acceptance <strong>of</strong> this Offer, and<br />

(b) carry out and complete the <strong>Project</strong> in accordance with the terms <strong>of</strong> tins<br />

Offer, and the Federal Airport Act and the Regulations promulgated<br />

thereunder by the Administrator in effect on the date <strong>of</strong> this Offer,<br />

which Act and Regulations are incorporated herein and made a pa ft<br />

here<strong>of</strong>, and ,<br />

(c) carry out and complete the <strong>Project</strong> in accordance with the plans and<br />

specifications and property map incorporated herein as they rnay be<br />

revised or modified with the approval <strong>of</strong> the Administrator or his dul}<br />

authorized representatives.<br />

3. The Board <strong>of</strong> Trustees <strong>of</strong> the University <strong>of</strong> Illinois shall operate and maintain<br />

the Airport as provided in the <strong>Project</strong> Application incorporated herein.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!