i no BOARD OF TRUSTEES [February 18<br />

Funds are available in the state capital appropriations for 1957-59, subject to<br />

release by the Governor.<br />

I concur and recommend that the Comptroller and the Secretary <strong>of</strong> the Board<br />

be authorized to execute this contract, subject to release <strong>of</strong> funds.<br />

On motion <strong>of</strong> Mr. Nickell, this contract was awarded, as recommended,<br />

and the Comptroller and the Secretary <strong>of</strong> the Board were<br />

authorized to execute the same. This action was taken by the following<br />

vote: Aye, Mr. Bissell, Mrs. Holt, Mr. Johnston, Mr. Livingston,<br />

Mr. Nickell, Mr. Swain, Mr. Williamson; no, none; absent, Mr. Herrick,<br />

Mr. Hughes, Mr. Stratton, Mrs. Watkins.<br />

CONTRACT FOR CONSTRUCTION OF PHYSICS BUILDING<br />

(10) The Director <strong>of</strong> the Physical Plant Department and the Vice-President and<br />

Comptroller recommend award <strong>of</strong> a contract for $1,436,400 to May fair Construction<br />

Company, Chicago, Illinois, for the construction <strong>of</strong> the first unit <strong>of</strong> a new<br />

Physics Building. This contract will be for all construction work, including the<br />

mechanical trades.<br />

In response to advertisements and other notices, nine bids were received on<br />

February 4, 1958. Instructions to bidders called for a base bid and a series <strong>of</strong><br />

alternates, the University reserving the right to accept or reject any or all. The<br />

base bid and alternates submitted by Mayfair Construction Company recommended<br />

for acceptance are:<br />

Base bid $1 408 800<br />

Additive alternates<br />

Additional foundation piling west <strong>of</strong> the building 10 700<br />

Installation <strong>of</strong> additional shelving in <strong>of</strong>fices 4 400<br />

Metal acoustical treatment in corridors II 000<br />

Anemostat mixing boxes for future air conditioning installation.... 1 500<br />

Total $1 436 400<br />

The additional piling is recommended as a protection against damage to this<br />

first unit through driving <strong>of</strong> foundation piling for the adjoining second unit <strong>of</strong> the<br />

building when the latter is constructed. The other alternates are recommended as<br />

highly desirable accessories since the base bid allows sufficient funds for these<br />

provisions.<br />

Funds are available in the state capital appropriations for 1957-59, subject to<br />

release by the Governor. The contract price is well within budget estimates for<br />

building construction.<br />

A base bid, lower by $185,600, was submitted by Hudson Construction Company,<br />

Inc., Rantoul, Illinois, but its <strong>of</strong>ficers promptly reported that a basic error<br />

was made in estimating and preparation <strong>of</strong> the bid and requested permission to<br />

withdraw it. The Legal Counsel has advised that when a basic, unintentional error<br />

has been committed by a bidder — which has been verified in this case — the<br />

University may properly permit the bid to be withdrawn and return the bid<br />

deposit. The Director <strong>of</strong> the Physical Plant Department and the Vice-President<br />

and Comptroller recommend that the request <strong>of</strong> the Hudson Construction Company,<br />

Inc., be granted, including return <strong>of</strong> its deposit, and that Mayfair Construction<br />

Company be declared the lowest bidder.<br />

Submitted herewith is a schedule <strong>of</strong> all bids received, with a report on this<br />

matter from the Director <strong>of</strong> the Physical Plant Department; copies are being<br />

filed with the Secretary <strong>of</strong> the Board for record.<br />

I concur in the above recommendations and request that the Comptroller and<br />

the Secretary <strong>of</strong> the Board be authorized to execute the contracts subject to the<br />

release <strong>of</strong> funds.<br />

On motion <strong>of</strong> Mr. Williamson, this contract was awarded, as recommended<br />

and the Comptroller and the Secretary <strong>of</strong> the Board were<br />

authorized to execute the same. This action was taken by the following<br />

vote: Aye, Mr. Bissell, Mrs. Holt, Mr. Johnston, Mr. Livingston, Mr.<br />

Nickell, Mr. Swain, Mr. Williamson; no, none; absent, Mr. Herrick,<br />

Mr. Hughes, Mr. Stratton, Mrs. Watkins.