1956] UNIVERSITY OF ILLINOIS 6l<br />

School <strong>of</strong> Nursing remodeling 376<br />

Neuropsychiatry Institute cabinets for room 23 2 500<br />

Alterations to rooms 306, 312, and 313 834<br />

Illinois Surgical Institute screens 813<br />

Dentistry-Medicine-Pharmacy Building remodeling room 606 626<br />

Research and Educational Hospitals improved lighting and shelving... 1 015<br />

Total, Chicago Pr<strong>of</strong>essional Colleges (200 545)<br />

Chicago Undergraduate Division<br />

Liberal Arts and Sciences administration equipment 44<br />

Mathematics special equipment 128<br />

Physical Sciences equipment 250<br />

Biological Sciences microscope 1 888<br />

Engineering remodeling and equipment 139<br />

Architecture and Art equipment 750<br />

Physics Laboratory equipment 5 618<br />

Shop Laboratory equipment 265<br />

Student Counseling Bureau remodeling 775<br />

Physics Laboratory remodeling 8 541<br />

Drill Hall repairs 20 000<br />

Total, Chicago Undergraduate Division (38 398)<br />

Grand Total $1 051 289<br />

On motion <strong>of</strong> Mr. Johnston, these reappropriations were made by<br />

the following vote: Aye, Mr. Herrick, Mr. Johnston, Mr. Livingston,<br />

Mr. Megran, Mr. Swain, Mrs. Watkins, Mr. Williamson; no, none;<br />

absent, Mr. Bissell, Mrs. Holt, Mr. Nickell, Mr. Stratton.<br />

CONTRACTS FOR CONSTRUCTION OF THE BIOLOGY BUILDING<br />

(7) The Director <strong>of</strong> the Physical Plant and the Vice-President and Comptroller<br />

recommend award <strong>of</strong> the following contracts for the construction <strong>of</strong> the Biology<br />

Building. The award in each case would be to the lowest bidder:<br />

General — Mayfair Construction Company, Chicago<br />

Base bid, plus chalk and bulletin boards, treadmills, and refrigerators<br />

'. $1 593 900<br />

Heating and refrigeration — George S. Walker Plumbing and Heating,<br />

Inc., Decatur<br />

Base bid, plus air conditioning class and lecture rooms 906 320<br />

(This will be reduced by change orders to eliminate temperature<br />

controls estimated at $10,000)<br />

Ventilation — Robert H. Bishop, Champaign 231 856<br />

Plumbing — Bellis and Miller, Inc., Champaign<br />

Base bid, omitting subsoil drainage 284 063<br />

Underground sewers and water — Bellis and Miller, Inc., Champaign.. 16 842<br />

Pipe covering and insulation — Standard Asbestos Manufacturing<br />

Company, Chicago<br />

Base bid, plus air conditioning class and lecture rooms 99 701<br />

(Change orders will be issued to eliminate duct covering estimated<br />

at $20,000)<br />

Electrical work — Leverenz Electric Company, Inc., Danville<br />

Base bid, plus air conditioning class and lecture rooms 313 491<br />

Laboratory equipment — Hamilton Manufacturing Company, Two<br />

Rivers, Wisconsin 308 317<br />

Total $3 754 49°<br />

Less estimated reductions by change orders — 30 000<br />

Net $3 724 490<br />

The Director <strong>of</strong> the Physical Plant and the Vice-President and Comptroller<br />

recommend that award <strong>of</strong> the contract for laboratory equipment be subject to<br />

the availability <strong>of</strong> funds after July 1, 1957, and that it include a provision that<br />

in the interim the contractor will prepare shop drawings needed by other contractors<br />

in providing service connections for laboratory equipment at cost