14.12.2012 Views

Optivity Telephony Manager: System Administration - BT Business

Optivity Telephony Manager: System Administration - BT Business

Optivity Telephony Manager: System Administration - BT Business

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ESN Analysis and Reporting Tool 733<br />

Deleting a Secondary database<br />

When only the Secondary ESN database is deleted, the link from Primary to Secondary<br />

is not cleared (Table 62). The user has to remove the link to the Secondary database from<br />

the Primary database.<br />

Table 62<br />

<strong>System</strong> with ESN database type deleted<br />

Database Type Description<br />

Primary ESN database<br />

deleted<br />

Secondary ESN database<br />

deleted<br />

The table storing the association between Primary and<br />

Secondary databases will be deleted along with the<br />

system.<br />

Limitation: The Secondary flag associated with the<br />

Secondary database will not be cleared. The database<br />

will continue to be tagged as a Secondary but with no<br />

Primary. The only way to clear the flag is to delete the<br />

Secondary database.<br />

Only the Secondary database is deleted, the Primary –<br />

Secondary association in the Primary database is not<br />

updated.<br />

The Secondary entry has to be manually deleted from<br />

the Primary database See “Deleting a Secondary<br />

database” on page 733<br />

CAUTION — Service Interruption<br />

Deletion of a site also deletes all of its systems.<br />

<strong>Optivity</strong> <strong>Telephony</strong> <strong>Manager</strong> <strong>System</strong> <strong>Administration</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!