Meeting Minutes<br />

CCN: 146128<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach~,~ ~'~ 2<br />

August 25, 2009<br />

ATENS<br />

DSTRBUIO<br />

E. L. Adamson X3-40 S. D. Bighamn N3-30<br />

C. L. Beach X3-16 R. D. Cantwell N3-30<br />

R. D. Belden (DDI) Q. L. Grist X3-16<br />

S. C. Bentti X3-16 R. A. Dodd H4-24<br />

M. R. Coy (DDI) T. A. Foster N3-30<br />

T. M. Greager X3-40 R. Ganapathy X3-40<br />

L. W. Grossarth X9-08 R. M. Harrison N3-30<br />

W. R. Junkins X3-16 S. J. Henneman X9-08<br />

L. R. Miller (DDI) M. F. Imhioff X9-08<br />

S. E. Parnell X3-16 D. L. Schilperoort T2- 10<br />

H. Williams III N3-30 D. B. Teachout X9- 10<br />

S. A. Strope (DDI) R. C. Voeks L6-06<br />

J. A. Heard H14-17 J. A. Ware N3-30<br />

D. J. Wonders (DDI) Project File, X3-16<br />

A. E. Zacharias X9-08 Records and Document Control H4-1 1<br />

A meeting on the above subject was held on August 25, at I118-K, MO-755.<br />

1. SAFETY<br />

*Safety topic: See the blacken hills; the cool spell will not last long. Need to be aware of the fire<br />

dangers. School will be starting next week; more people and busses will be out and about, need<br />

to pay attention while driving.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

* Drawings not complete; site layout is a post-start item and a status will be given at the Thursday<br />

meeting. DDI has initiated drawing designs.<br />

" Equipment List is in process, still on schedule to begin equipment inspections September I".<br />

* WCH needs training records for those on site during mobilization (HGET, FR H&S Plan)<br />

* Have first DDI laborer walkdown and re-work air monitor 480V on ground cable signs and rope.<br />

* Chance Notice 003 will be issued to purchase/lease JO-Kenwood radios and charge banks.<br />

* Sub-tier contractor training prior to beginning work (IWCP work responsibility, HASP, EP,<br />

THAs, Fall Protection Plan)<br />

C:\Docunents and Settings\cibeachTLecal Setfings\fernporary Internet Files\OLK908-25-09 Weekly Progre~S (2).tloc.