Meeting Minutes<br />

CCN: 150028<br />

lg<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

E011 Christopher L. Beach ~~<br />

April 6, 2010<br />

DISTRBUTIO<br />

E. L. Adamson X3-40 D. Bollinger (DDI)<br />

C. L. Beach X3-16 R. D. Cantwell N3-30<br />

Q. L. Crist X3-16 R. W. Cross H4-25<br />

T. Dance (DDI) X3-17 C. Flowers (DDI) X3-17<br />

A. Gagnon X9-08 R. A. Dodd 114-24<br />

W. R. Junkins X3-16 T. A. Foster N3-30<br />

S. E. Parnell X3-16 R. Ganapathy X3-40<br />

M. Sherman (DDI) X3-17 L. W. Grossarth X9-08<br />

H. C. Weber (DDI) X3-16 J. A. Heard H4-17<br />

D. G. Saueressig N3 -30<br />

D. B. Teachout X3-16<br />

J. A. Ware N3-30<br />

H. Williams III X3-16<br />

A. E. Zacharias X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control 114-11<br />

A meeting on the above subject was held on April 6, 2010 at 11 8-K, MO-755.<br />

1. SAFETY<br />

* Safety topic: There was a roll-over accident on Route 4 on the drive home commute. Need to<br />

practice defensive driving, observe traffic controls like speeding, passing, etc.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

* Electrical Drawings for electrical tie-ins, as-builts and diesel tank electrical design have been<br />

submitted to WCH. Review and comments to be returned to RDC today. DDI incorporating<br />

comments and will resubmit. DDI to submit by 1/28/2010. WCH has received, in preliminary<br />

review, will return this week. WCH returned to DDI, status 2, with comments. DDI will be<br />

doing a walkdown with Mr. Teachout to incorporate comments and will resubmit drawings for<br />

approval. DDI to check on status. DDI waiting on North Point. DDI still waiting on North<br />

Point. They have exceeded the 30-day expected response to a returned submittal. DDI to follow<br />

up with North Point again this week.<br />

* PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

Z:\Administrative Assistari\Project Progress Review Weekly Meetings\2010\April\4-6-1O Weekly Progress.doc