17.12.2013 Views

FOI_2011-00646_Enclosure - Hanford Site

FOI_2011-00646_Enclosure - Hanford Site

FOI_2011-00646_Enclosure - Hanford Site

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

uance uiestgns Inc.<br />

118-K-1 Burial Ground Remediation Project<br />

Submittal Log<br />

_____________Date:<br />

Lgn: Submitted Returned wicommenta Required Returned wlStatus '.1"<br />

al ~ Date<br />

Draft or Date Date Dt<br />

Submittal No./Descriptiofl Rev. Send To Required Submitted Returned. Status C~omments<br />

3-13 information necessary to complete an<br />

annual PCB Report (i.e., out-nt-service<br />

s sR'<br />

daterwaste stream. waste codes, net<br />

weight, container number, and shipment<br />

number) for Subcontractor generated<br />

waste that contains PCBO.<br />

8/17/09 3:36 PM<br />

3-14 informtation necensary to cnmplete an<br />

annual Dangerous Waste Report (i.e..<br />

SC As Rq'd<br />

waste stream, waste codes, net weight,<br />

coetainer number, and shipment somber)<br />

for Subcontractor generated waste.<br />

3-15 Qoatrenly Summary of Recycling SC As Rq'd<br />

Actividies<br />

3-16 Formal Written Designations of All Waste SC Before Work<br />

Streams Generated<br />

3-17 Requests for Approval for Use of SC Before Work<br />

Oils/Greases<br />

OttO-SS-Sby01-3-tl<br />

3-18 Transportation Security Plan SC Before Work ____<br />

n/a<br />

4.00 PROCUREMENT ___ ___ ____ ____ ____<br />

4-01 IDefect under Warranty PR As Rci'd_________________<br />

4-02 Claim for Equitable Adjustment PR As Rq'd __ ____<br />

4-03 Insurance Certificates SA 10 fDue July 18, 2009<br />

011tBK-SS-50001 -4-03<br />

n/a<br />

4-04 Insurance Cancellation. Termination, or SA As Rq'd<br />

Alteration<br />

4-05 Amendment of Limits of Insurance SA As Rq'd<br />

4-06 Aathorized Representative Before Work<br />

01 18K-88-80001-4-06 n/la<br />

4-07 Charge Notlces PR As Rq'd______ ______________<br />

(Changes)<br />

4-09 Backcharge Notice Approval PR As Rq'd _____<br />

4-10,Proposal for Adjustment (Trermination) PR As Rcj d _ __<br />

4-12 Purchase and Subcontract Agreements SA As Rq'd<br />

4-13 Dispute Notification SA As Rq'd<br />

4-141 Workplace Substance Abase Program SA 30 _____ _____ _____Due Aug 7, 2009<br />

0llaK-SS-SOOOI-4-14 0-8/21/2009<br />

4-15 SFl4t3-Daois Bacon Compliance SA As Rq'd<br />

(Statement ot Acknowledgement)<br />

4-16 Letter of Credit SA 10 Due July 18, 2009<br />

0t 18K-SS-SSOt-4-1O<br />

n/a<br />

4-17 Performance and Paymert Bonds SA 7 - Due July 15, 2009 Does Not Apply<br />

4-8Masurement and Schedute for Progress SA 15 Due July 23, 2009<br />

Pament<br />

01 tgK-SS-SO00l-4-18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!