Meeting Minutes<br />

washingmCCN: 152502<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

- Distribution<br />

Scott E. Parnell<br />

July 14,2010<br />

ATNS<br />

t srRBTO --<br />

Q L. Crist X~3-16 E.L. Adamson X3-40<br />

R. Ferguson (1311)) X3-17 C. L. Beach X3-16<br />

J. A. Heard H4-17 D. Bollinger (DDT)<br />

S, E. Parnell X3-16 R. D. Cantwell N3-30<br />

M. Sherman (DDI) X3.-17 R. W. Cross 114-25<br />

H. C. W~eber (D31)) X3-16 T. Dance (DDI)) X3-17<br />

H. Williamns III X3-16 R. A. Dodd H4-24<br />

C. Flowers (DDI)) X3-17<br />

T. A. Foster N3-30<br />

A. Gagnon X9-08<br />

R. Ganapathy X3-40<br />

S. J. Huddleston X3-116<br />

W. R. Junkcins X3-16<br />

D,. G. Saueressig N3-30<br />

13. B. Teachout X3-16<br />

1 Zeisloft A3-04<br />

Project File, X3. 16<br />

---- - ---- Records and Documient Control H4-11I<br />

A meeting on the above subject was held on July 14, 2010 at 1 I 8-K, MO-75 5.<br />

I. SA-FETY<br />

Safety topic: it pays to use prope PPE for tasks being performed. 1(b)(6) __elated<br />

incident<br />

her<br />

on a 4-wheeler last week. Safety needs to be the first concern and safety awareness does<br />

not end when you leave the project.<br />

I. ACTION ITEMS FROM LAST MEETINGISTATIUS<br />

PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC I100-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this conftiguration by<br />

Protection<br />

the Fire<br />

Enginee. WCH has followed up on status and has resolved CHPRC concerns and<br />

requests. CurrentlyJust waiting on the ptrnnits to be issued by CHPRC. Discussed 150 gprn<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permits scheduled to be complete by 1/14/2010. Still waiting on permits fromn CHPRC,<br />

WCH following up. Hydrant permit is in hand, waiting for excavation permi t. Plan to perform<br />