Progress Review Meeting<br />

Page 4<br />

given to DDI today. (8/10)<br />

" WCH asked how DDI is tracking BCL material. No measurement/tracking of BCL material has<br />

been provided to WCH. (7/27) DDI states they are tracking loader buckets and CAT truck loads<br />

on a daily report. They will confirm if it is included in the daily report being provided to WCH.<br />

(8/10)<br />

o<br />

DDI indicated a survey will be completed to measure quantity when the stockpile is<br />

completed. (7/27) DDI indicates this is being tracked. WCH would like to review data; DDI<br />

will include in production report next week. (8/3)<br />

" WCH requests a full schedule update from DDI. (8/3) No update. (8/10)<br />

" DDI requests meeting next week to again discuss anomaly definition - tentatively scheduled for<br />

8/10 immediately following this meeting. (8/3) Meeting to be tentatively scheduled for later<br />

today. (8/10)<br />

I11. PROJECT DESIGN DRAWINGS<br />

*DDI still needs to submit for WCH review as-builts for electrical as well as the energized water<br />

line. (5111) No change. (5/18) No change. (5/25) Electrical drawing modifications have been<br />

discussed between DDI and WCH STR. (6/1) This is a topic of discussion in a meeting on 6/10<br />

between Watts and DDI. (6/8) DDI has additional questions about these as-built requirements.<br />

(6/15) No change. (6/22) WCH has received and is in review. (6/29) DDI has received the<br />

reviewed comments from WCH and is working to get the drawing updated. They commit to<br />

having the drawing resubmitted by 7/21. (7/14) No change. (7/20) The drawing needs to revved<br />

to reflect 15 amp versus 20 amp fuses. (7/27) Fuse has been changed out in accordance with the<br />

drawing. WCH is returning status 1. (8/3)<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

o See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

* No intrusive work can be started relative to Trench I until the PSR has been approved and signed<br />

off by WCH management.<br />

* See attached.<br />

VI.<br />

VII.<br />

MANPOWER<br />

* See attached.<br />

* WCH asks if DDI has any plans to bring on an additional teamster. (8/10)<br />

* Recently WCH observed operators driving water trucks. Per the HSSA contract that is not<br />

allowable. DDI will issue a letter to their sub-tier, WCI concerning this. (8/10)<br />

EQUIPMENT<br />

* See attached.<br />

* Rock truck left the site on 8/2. (8/3) The rock truck is not DOT legal and should not be run on<br />

the road when traveling to and from the site. (8/10)<br />

0 350 excavator will be on site by the end of the week. A bucket that may be utilized on this<br />

machine that is configured for CRATER use is coming from the WCH 100-D project without<br />

required escorting, etc. (8/3) No update, DDI to confirm the ETA of the 350 to the project.<br />

(8/10)<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDT