Progress Review Meeting<br />

Page 5<br />

*WCH QA will be conducting surveillance on contract flowdown and review of sub-tier QA<br />

programs. (5/25) This is ongoing. (6/1) There may be an issue with the flowdown of submittals<br />

between Watts and DDI. WCH QA suggests that DDI review their contract to determine if there<br />

is a breakdown. Per the WCH QA this is becoming an item of increasing interest for DOE and<br />

WCH. (6/8) DDI should be prepared for an inspection of their QA plan and flow-downs by<br />

WCH QA in the near future. (6/29) DDI provided copy of surveillance by WCH QA. This<br />

surveillance will be ongoing this week and next. (7/14)<br />

XI.<br />

XII.<br />

XIII.<br />

REQUESTS FOR INFORMATION<br />

* DDI will be issuing an REI for the scheduler position, duties and WCH expectations. No update<br />

(5/4). No update. (5/11) No change. (5/18) Received, WCH in review. (5/25) No update. (6/1)<br />

WCH commits to having a response to DDI no later than 6/15. (6/8) WCH commits to having<br />

response to DDI 7/15. (7/14)<br />

* DDI requests a discussion about the cost of the IH monitoring in support of confirmnatory<br />

sampling sent out for processing. (6/8) WCH in review of letter from DDI. (6/15) No change.<br />

(6/24) No change. (6/29) WCH commits to a response by next week. (7/14)<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* See attached.<br />

Electrical Drawings for electrical tie-ins, as-builts and diesel tank electrical design have been<br />

submitted to WCH. Review and comments to be returned to RDC today. DDI incorporating<br />

comments and will resubmit. DDI to submit by 1/28/2010. WCH has received, in<br />

preliminary review, will return this week. WCH returned to DDI, status 2, with comments.<br />

DDI will be doing a walkdown with Mr. Teachout to incorporate comments and will resubmit<br />

drawings for approval. DDI to check on status. DDI waiting on North Point. DDI still<br />

waiting on North Point. They have exceeded the 30-day expected response to a returned<br />

submittal. DDI to follow up with North Point again this week. No update, still with DDI<br />

(4/20). No update (4/27). No update (5/4). No update from DDI. WCH issued SDR. (5/18)<br />

No update. (5/2 5) No update. (6/8) WCH is in review of drawing. (6/29) DDI has received<br />

the reviewed comments from WCH and is working to get the drawing updated. They commit<br />

to having the drawing resubmitted by 7-21. (7/14)<br />

" WCH return traffic control drawings to DDI, status 2. DDI will be resubmitting soon<br />

incorporating the WCH comments. DDI to submit this week. Drawings are with North Point for<br />

revision and will be resubmitted upon their return. DDI is well beyond the 30-day resubmission<br />

for updated drawings. WCH will be issuing an SDR regarding this issue. DDI has indicated they<br />

are working on a deficiency letter which will be submitted to Watts for this and several other<br />

deficiencies. (5/11) No update. (5/18) No update. (5/25) WCH received traffic control submittal<br />

6/3 and is in review of same. (6/8) WCH has returned to DDI status 2. (6/22) No change. (6/29)<br />

DDI has received base CADD file and is in process of updating drawing. They commit to<br />

resubmitting drawing by 7/21. (7/14)<br />

* WCH requests as-built drawings of the energized water system. No update (5/4). No update.<br />

(5/11) SDR provided, no update. (5/18) No update. (5/25) No update. (6/8) DDI submitted redline<br />

copies. WCH will provide a drawing number to DDI. (6/29) DDI has received the reviewed<br />

comments from WCH and is working to get the drawing updated. (7/14)<br />

CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

" See attached.<br />

" DDI can expect to see revision soon to Change Notice 025 regarding use of last four digits of