Progress Review Meeting<br />

Page 5<br />

has received base CADD file and is in process of updating drawing. They commit to<br />

resubmitting drawing by 7/21. (7/14) DDI is working with their design group to get the drawings<br />

updated, but DDI has had issues with the CADD file, submission bumped to 7/26. (7/20) DDI is<br />

reviewing the cost of drawing; anticipate submittal of drawing by 8/3. (7/27) Submittal delivery<br />

has been pushed to 8/12. (8/3) Drawing should be available for DDI review from their sub-tier by<br />

8/18, they will submit to WCH for review no later than 8/23. (8/10) Draft of waterline drawing<br />

will be walked down this afternoon. (8/24) Continuing. (8/3 1) Drawings returned status 2 to<br />

DDI. DDI to rev drawing and it will be approved as status 1. (9/22)<br />

WCH return traffic control drawings to DDI, status 2. DDI will be resubmitting soon<br />

incorporating the WCH commnents. DDI to submit this week. Drawings are with North Point for<br />

revision and will be resubmitted upon their return. DDI is well beyond the 30-day resubmission<br />

for updated drawings. WCH will be issuing an SDR regarding this issue. DDI has indicated they<br />

are working on a deficiency letter which will be submitted to Watts for this and several other<br />

deficiencies. (5/11) No update. (5/18) No update. (5/25) WCH received traffic control submittal<br />

6/3 and is in review of same. (6/8) WCH has returned to DDI status 2. (6/22) No change. (6/29)<br />

They commit to resubmitting drawing by 7/21 (7/14). DDI will install signs to match the traffic<br />

control drawing then resubmit. (7/20) Drawing should be available for DDI review from their<br />

sub-tier by 8/18, they will submit to WCH for review no later than 8/23. (8/10) WCH is in<br />

review of submitted drawing. (8/3 1) WCH anticipates returning this week with no comments.<br />

(9/7) Returned to DDI as status 1. (9/22)<br />

XIII. CHANGE NOTICES/STATUS/CHANGE ORDERS<br />

0 See attached.<br />

XIV.<br />

XV.<br />

XVI.<br />

CORRESPONDENCE (since last meeting)<br />

" Transmittal from DDI: Updated proposal for CN 007 R I<br />

" Transmittal from DDI: Response to CN 009 (Exhibit G)<br />

" Transmittal from DDI: Proposal for CN 019<br />

" Transmittal from DDI: Acknowledgement of CN 027<br />

* Letter from DDI: NCR 002-10<br />

* Weekly Progress Review Meeting Minutes 9/7/2010<br />

" Modification I to Contract C008753A00<br />

" CN029 Exhibit J, Greenhouse Gas Emissions<br />

IN VOICE AND PAYMENT STATUS<br />

* WCH to release partial release of 15% retention for deficiency for May and July. (9/22)<br />

OTHER COMMENTS/NEW ACTION ITEMS<br />

*None.<br />