Progress Review Meeting<br />

Page 4<br />

production report next week. (8/3) No update. (8/17)<br />

* WCH requests a full schedule update from DDI. (8/3) No update. (8/10) No update. (8/17)<br />

* DDI requests meeting next week to again discuss anomaly definition - tentatively scheduled for<br />

8/10 immediately following this meeting. (8/3) Meeting to be tentatively scheduled for later<br />

today. (8/10) Meeting scheduled for Wednesday 8/18. (8/17)<br />

* DDI expressed concerns about CRATER operations in the field. CRATER performance is<br />

impacting work in the field. WCH is evaluating CRATER operations and will provide feedback.<br />

(8/10) Additional detailed discussions over CRATER operations after a thorough review by the<br />

WCH CRATER expert. (8/17)<br />

III.<br />

IV.<br />

PROJECT DESIGN DRAWINGS<br />

0 None.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

o See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

" No intrusive work can be started relative to Trench I until the PSR has been approved and signed<br />

off by WCH management.<br />

* See attached.<br />

VI.<br />

VII.<br />

MANPOWER<br />

* See attached.<br />

* WCH asks if DDI has any plans to bring on an additional teamnster. (8/10) DDI indicated there<br />

are no plans to bring on another teamnster. This leaves seven (7) teamsters for 10 trucks. (8/17)<br />

* Recently WCII observed operators driving water trucks. Per the HSSA contract that is not<br />

allowable. DDI will issue a letter to their sub-tier, WCI concerning this. (8/10) DDI has not yet<br />

issued letter. (8/17)<br />

EQUIPMENT<br />

* See attached.<br />

0 350 excavator will be on site by the end of the week. A bucket that may be utilized on this<br />

machine that is configured for CRATER use is coming from the WCH Il00-D project without<br />

required escorting, etc. (8/3) No update, DDI to confirm the ETA of the 350 to the project.<br />

(8/10) The 350 excavator will be on site by the end of the week or first of next week. (8/17)<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

* None.<br />

* WCH intends to begin working on Trench I silo work packages in early August. Tentative<br />

meeting set for 8/16 to discuss work package for Trench I silos. WCH to confirm with planners<br />

on schedule. (8/3) When the initial work package is developed, craft will be involved in the fine<br />

tuning of the WP. (8/10) Meeting postponed to Monday, 8/23. (8/17)<br />

" WCH is testing the use of tungsten silicone mats as shielding/distance barriers for ERDF cans. If<br />

these work as an effective shield, the technical procedure may need to be revised for the use of<br />

them. (8/10) WCH will work with planners for any needed revisions relating to the use of<br />

silicone mats. (8/17)