Progress Review Meeting<br />

Page 5<br />

VIII. WORK PACKAGE NEEDS IN ORDER OF PRIORITY AS SET BY DDI<br />

* None.<br />

4 WCH intends to begin working on Trench I silo work packages in early August.<br />

IX.<br />

MATERIAL<br />

*DDI to begin the process of ordering ecology block that will be used in the Trench I Silo<br />

remediation.<br />

X. QUALITY<br />

* DDI was issued SDR (FR-201 0-IF-03 82-SDR-0 15) on 5/17/2010 for as-built drawings. (5/25)<br />

No update. (6/1) No update. (6/8) DDI to provide CAR by 6/24/10. (6/22) WCH received<br />

CAR today. (6/29) WCH is reviewing CAR. DDI has received the reviewed comments from<br />

WCH and is working to get the drawing updated. They commit to having the drawing<br />

resubmitted by 7/21. (7/14) CAR has been reviewed by WCH and will be closed. (7/20)<br />

* The Kenworth haul trucks are on hold for use with 25-ton cans until final certification data is<br />

provided. Submittal for certification was returned status 3. No update (5/4). No update. (5/11)<br />

No update. (5/18) No update. (6/1) No update. (6/8)<br />

*WCH issued SDR (FR-201 0-IF-0092-017) to DDI on 5/24/2010 for shuttle truck<br />

specifications. (5/25) No update. (6/1) No update. (6/8) DDI to provide CAR by 6/24/2010.<br />

(6/22) WCH received CAR today. (6/29) WCH is in review of the CAR (7/14) WCH QA<br />

would like DDI to update the letter provided in response with current information and dates.<br />

(7/20)<br />

* WCH QA will be conducting surveillance on contract flowdown and review of sub-tier QA<br />

programs. (5/25) This is ongoing. (6/1) There may be an issue with the flowdown of submittals<br />

between Watts and DDI. WCH QA suggests that DDI review their contract to determine if there<br />

is a breakdown. Per the WCH QA this is becoming an item of increasing interest for DOE and<br />

WCH. (6/8) DDI should be prepared for an inspection of their QA plan and flow-downs by<br />

WCH QA in the near future. (6/29) DDI provided copy of surveillance by WCH QA. This<br />

surveillance will be ongoing this week and next. (7/14) The surveillance will be conducted on<br />

7/22 for this site. (7/20)<br />

" A surveillance was completed today on compressed gas bottles/cylinders. DDI was provided the<br />

checklist for the surveillance last week. WCH is concerned because the inspection today showed<br />

deficiencies even after the criteria were provided ahead of time. (7/20)<br />

* WCH PSR and WCH IHI will be performing a heat stress assessment today. No problems are<br />

anticipated. (7/20)<br />

XI.<br />

XII.<br />

REQUESTS FOR INFORMATION<br />

* DDI will be issuing an RFI for the scheduler position, duties and WCH expectations. No update<br />

(5/4). No update. (5/11) No change. (5/18) Received, WCH in review. (5/25) No update. (6/1)<br />

WCH commits to having a response to DDI no later than 6/15. (6/8) WCH commits to having<br />

response to DDI 7/15. (7/14) This will be issued by WCH by the end of the week. (7/20)<br />

* DDI requests a discussion about the cost of the IH monitoring in support of confirmatory<br />

sampling sent out for processing. (6/8) WCH in review of letter from DDI. (6/15) No change.<br />

(6/24) No change. (6/29) WCH commits to a response by next week. (7/14) On schedule to be<br />

completed by the end of this week. (7/20)<br />

TECHNICAL DATA SUBMITTALS/STATUS<br />

* See attached.