Progress Review Meeting<br />

Page 3<br />

plans to submit as-built drawings (rev. 0) by the end of the week. (9/28) DDI still waiting on<br />

drawings from their subcontractor. Anticipate they will be received by the end of the week.<br />

(10/5) As-built is status 2 (will be revved to Status I upon receipt of Rev 0) and is with ARES<br />

for completion. (10/12)<br />

* Prior to moving the truck scale with the non-conforming lifting eye, a lift plan will be developed.<br />

(8/3) This item will remain in these minutes until demobilization as a reminder. (8/10)<br />

" On 7/8/2010 DDI submitted a letter addressing delays. WCH commits to providing a response<br />

when the STR returns from vacation. This will be a priority upon his return. (7/20) WCH will<br />

have this to DDI by the end of the week. (8/3) WCH has prepared a response letter and it will be<br />

given to DDI today. (8/10) Discussion of delays and WCH's letter in response to DDI's request.<br />

Further discussion tabled to another meeting. (8/17) The next meeting will be a line-by-line<br />

review. To be scheduled for next week. (8/24) DDI to provide a letter response. Meeting<br />

rescheduled for Wednesday 9/1. (8/3 1) Meeting held last week, scheduling will continue as<br />

needed. (9/7) DDI would like to schedule this to follow the 9/27 1:00 meeting. (9/22) Meeting<br />

rescheduled for Monday at 1:00 p.m. (9/2 8) Delay impacts meeting scheduled for 10/6/10 at<br />

1:00. (10/5) Delay impacts meeting to be rescheduled, time TBD. (10/12)<br />

" Heaters for the tent have been delivered this week. DDI should have light plant at turn off soon.<br />

WCH urged DDI to review their Cold Weather Protection Plan. (9/28)<br />

" DDI to look at antifreeze used in containers to keep from sticking to the ERDF cans during<br />

freezing weather. DDI should contact WCH EPL for recommendations. (9/28)<br />

* DDI to provide authorization letter for Mr. Soulia to sign on behalf as DDI authorized<br />

representative. (9/2 8)<br />

" Discussed shower facilities, PPE, towels, and janitorial DOR's. (10/5)<br />

* Discussed plans for Jewell site visit (Portland). Discussion included schedule, logistics, etc.<br />

Schedule to be completed by 10/18/2010. <strong>Site</strong> visit to Portland will be scheduled. (10/5)<br />

" DDI has not yet mobilized light plants per authorization in CN 019. Light plant is required to be<br />

on site no later than 10/01/20 10. (10/5)<br />

111. PROJECT DESIGN DRAWINGS<br />

" WCH asked DDI if excavation is still within pre-ex survey points. DDI to confirm. (9/28)<br />

* WCH requests R.O.M. drawing of electrical drawings which will be red-lined to placement of<br />

CHPRC air monitor changes. (9/28) DDI to provide, (no changes at this time). (10/12)<br />

" Discussed topo requirements for pre and post excavation drawings. (10/12)<br />

IV.<br />

UPDATED ROLLING 3-4 WEEK LOOK AHEAD SCHEDULE<br />

o See attached.<br />

V. WEEKLY PRODUCTION TABLE<br />

" No intrusive work can be started relative to Trench I until the PSR has been approved and signed<br />

off by WCH management.<br />

" See attached.<br />

VI.<br />

VII.<br />

MANPOWER<br />

& See attached.<br />

EQUIPMENT<br />

" See attached.<br />

" Need to check on return status of Kenworth truck that was sent to 100-F for Watts' work. This

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!