OWWRIMWEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach 7 ~~<br />

September 22, 2009<br />

ATEDE<br />

ISTRIUTIO<br />

C. L. Beach X3-16 E. L. Adamson X3-40<br />

R. D. Belden (DDI) S. D. Bigham N3-30<br />

S. C. Bentti X3-16 R. D. Cantwell N3-30<br />

D. E. Faulk L6-06 Q. L. Crist X3-16<br />

T. M. Greager X3-40 R. A. Dodd 114-24<br />

L. W. Grossarth X9-08 T. A. Foster N3-30<br />

J. A. Heard 1-4-17 R. Ganapathy X3-40<br />

S. E. Parnell X3-16 R. M. Harrison N3-30<br />

A. S. White (DDI) S. J. Henneman X9-08<br />

R. C. Voeks L6-06 D. E. Herman (Watts)<br />

D. J. Wonders (DDI) M. F. Imhoff X9-08<br />

W. R. Junkins X3-16<br />

D. L. Schilperoort T2-10<br />

S. A. Strope (DDI)<br />

D. B. Teachout X9- 10<br />

J. A. Ware N3-30<br />

H. Williams III N3-30<br />

A. E. Zacharias X9-08<br />

Project File, X3-16<br />

Records and Document Control 114-11<br />

A meeting on the above subject was held on September 22, at 118-K, MO-755.<br />

1. SAFETY<br />

*Safety topic: Watch driving conditions. Time to start thinking about vehicle winterization<br />

preparations.<br />

11. ACTION ITEMS FROM LAST MEETING/STATUS<br />

" DDI to use ARES Corp. for design work and Rogers for surveying work. May also use White<br />

Shield. DDI contracts not yet in place with surveyors.<br />

" Equipment List is in process, still on schedule to begin equipment inspections. DDI to provide<br />

updated equipment list this week, waiting for serial numbers for shuttle trucks.<br />

* Have first DDI laborer walkdown and re-work air monitor 480V on ground cable signs and rope<br />

to be completed today. Lines have been energized, ropes and postings to be complete this week.<br />

Z:\Administrative Assistant\Project Progress Review Weekly Meefings\2009\O9-22-O9 Weekly Progressedoc