Washington<br />

Closure<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

CCN: 152504<br />

W-A9:111WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

111111*01"M Scott E. Pamnellr -4Z<br />

July 20, 2010<br />

ATEDE<br />

DISRIBTIO<br />

D. Bollinger (DDI) E. L. Adamson X3-40<br />

Q. L. Grist X3-16 C. L. Beach X3-16<br />

R. Ferguson (DDI) X3-17 R. D. Cantwell N3-30<br />

A. Gagnon X9-08 R. W. Cross 114-25<br />

J. A. Heard H4-17 T. Dance (DDI) X3-17<br />

W. R. Junkins X3-16 R. A. Dodd H14-24<br />

S. E. Parnell X3-16 C. Flowers (DDI) X3-17<br />

H. C. Weber (DDI) X3-16 T. A. Foster N3-30<br />

H. Williams III X3-16 R. Ganapathy X3-40<br />

S. J. Huddleston X3-l6<br />

D. G. Saueressig N3-30<br />

M. Sherman (DDI) X3-17<br />

D. B. Teachout X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3- 16<br />

Records and Document Control H4-1 1<br />

A meeting on the above subject was held on July 20, 2010 at 11 8-K, MO-755.<br />

I. SAFETY<br />

*Safety topic: Tomorrow the 618-10 project will be doing a "flame-off' of a buried tank along<br />

side the highway. This will be a potential for driving distractions.<br />

II.<br />

ACTION ITEMS FROM LAST MEETING/STATUS<br />

*PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPRC 1 00-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CHPRC concerns and<br />

requests. Currently just waiting on the permits to be issued by CHPRC. Discussed 150 gpm<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permits scheduled to be complete by 1/14/20 10. Still waiting on permits from CHPRC.<br />

WCH following up. Hydrant permit is in hand, waiting for excavation permit. Plan to perform<br />

work on water line on an off shift work day, pushing for Friday 2/19/2010. Excavation permit is<br />

Z:\Adininistrative Assistant\Project Progress Review Weekly Meetings\20l0\July\7-20-O Weekly Progress.doc