17.12.2013 Views

FOI_2011-00646_Enclosure - Hanford Site

FOI_2011-00646_Enclosure - Hanford Site

FOI_2011-00646_Enclosure - Hanford Site

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CCN: 153545<br />

WCH <strong>Hanford</strong><br />

Meeting Minutes<br />

WEEKLY PROGRESS REVIEW MEETING C008753A00<br />

Distribution<br />

Christopher L. Beach<br />

October 12, 2010Ag<br />

ATENE<br />

ISTIUTO<br />

E. L. Adamson X3.40 D. Bollinger (DD1)<br />

C. L. Beach X3-16 R. D. Cantwell N3-30<br />

A. Gagnon X9-08 Q. L. Grist X3-16<br />

S. E. Parnell X3-16 R. W. Cross H4-25<br />

M. Sherman (DDI) X3-17 T. Dance (DDI) X3-17<br />

J. R. Soulia (DDI) X3-17 R. A. Dodd H4-24<br />

H. C. Weber (DDI) X3-16 C. Flowers (DDI) X3-17<br />

H. Williams IIH X3-16 T. A. Foster N3-30<br />

R. Ganapathy X3-40<br />

W. R. Junkins X3-16<br />

R. T. Hansen H4- 17<br />

J. A. Heard H4-17<br />

S. J. Huddleston X3-16<br />

D. G. Saueressig N3-30<br />

D. B. Teachout X3-16<br />

J. Zeisloft A3-04<br />

Project File, X3-16<br />

Records and Document Control H4- 11<br />

A meeting on the above subject was held on October 12, 2010 at I118-K, M0-755.<br />

1. SAFETY<br />

*Safety topic: Discussed driving in the fog and low visibility conditions. Wildlife will be on the<br />

roadways and drivers need to be extra alert.<br />

11. ACTION ITEMS FROM LAST MEETING/STATUS<br />

*PRC Deputy Fire Marshall has requested sketch of water system configuration that will be<br />

constructed. DDI to provide. The excavation permit and non-emergency hydrant tie-in permit<br />

approvals are with the CHPTRC 100-K Fire Protection Engineer pending their approval of this<br />

system. Additional request has been made for CAD drawings of this configuration by the Fire<br />

Protection Engineer. WCH has followed up on status and has resolved CI-PRC concerns and<br />

requests. Currently just waiting on the permits to be issued by CHPRC. Discussed 150 gpm<br />

restrictor to be installed at the hydrant tie-in as well as an additional restrictor at the water high<br />

tank. Permits scheduled to be complete by 1/14/20 10. Still waiting on permits from CHPRC.<br />

WCH following up. Hydrant permit is in hand, waiting for excavation permit. Plan to perform<br />

work on water line on an off shift work day, pushing for Friday 2/19/20 10. Excavation permit is<br />

CA~ocumnents and Sentings\clbeach\Local Seltings\Ternporary I nternet FiLesOLK1O7\I0- 12-10 Weekly Progremn dc